Profil coverbillede
Du følger nu
Fejl under følg af bruger.
Denne bruger har ikke tilladt andre bruger at følge dem.
Du følger allerede denne bruger.
Din medlemsskabsplan tillader kun at følge 0. Opgrader her.
Du følger nu ikke længere
Kunne ikke stoppe med at følge bruger.
Du har nu anbefalet
Kunne ikke anbefale bruger.
Noget gik galt. Forny venligst siden og prøv igen.
Email verificeret.
Brug Avatar.
$30 USD / time
Flag for EGYPT
giza, egypt
$30 USD / time
Det er i øjeblikket 3:00 PM her
Tilmeldt december 24, 2018
0 Anbefalinger

Mahmoud A.

@mahmoudadel33

0,0 (0 anmeldelser)
0,0
0,0
0%
0%
$30 USD / time
Flag for EGYPT
giza, egypt
$30 USD / time
N/A
Jobs færdiggjort
N/A
Indenfor budgettet
N/A
Til tiden
N/A
Genansættelsesrate

Structural Design Engineer

Structural Design Engineer-Concrete Structures ELSEWEDY ELECTRIC POWER SYSTEM PROJECTS Aug 2019 - Present (4 yr) Project: Julius Nyerere Hydropower Dam (JNHPP) Location of project : Tanzania Location of work : Tanzania , Dar es salaam , SMEC Offices . (2 yr and 6 mo ) Tanzania (Selous Site). (1 month) Cairo. (1 yr and 4 mo ) Duties: • Making structural Design for Erection Bay in Powerhouse Building. • Making structural BOQ for main hall units in the powerhouse building. • Making Structural Design for control building. • Making structural BOQ for control building. • Review the stability report and GDR report for powerhouse building. • Coordinate the structural drawing with other disciplines and make contact between dar es salaam and cairo team with site team. • Making structural design for auxiliary building in powerhouse building. • Making Structural Design For walkway. • Review 3d model of powerhouse related to construction drawing. • Coordinate the structural drawings for units no 1,4,5,8 with other disciplines and solve the clashes. • Track SMEC drafters on daily basis and send the comments to them to improve the quality of the drawings. • Coordinating the Artelia Comments reviews and share it with SMEC. Engineering programs used: Autocad, Sap2000, Revit, Bim360. Project: Layyah Combined Cycle Power Plant Location of project: UAE Location of work: Egypt Duties: making structural design for: • Fire Fighting tank, HRSK Storage support area foundation, trenches, duct banks and manholes. • air compressor building, emergency diesel generator foundation and pipes rack foundation. • central control building, secondary steel platforms foundation and water treatment building. • AutoCAD • SAP2000 • ommon electrical building, gas compressor electrical and GCB foundation. • fuel oil electrical building, gt oily drain pit foundation, fuel oil fence and Aux Transformers Foundation. • making structural BOQ for power plant to make a comparison between tender quantities and actual quantities and calculate the overrun in cost • structural bim models for cas compressor area building, power transformers, pipe racks support, common electrical building and control building by revit structural to check clashes and to export IFC model for overall power plant. Engineering Programs used: Autocad, Etaps, Safe, Sap2000, Revit Structural

Kontakt Mahmoud A. omkring dit job

Log ind for at diskutere detaljerne via chat.

Portfolio-mappe

4646080
4646080

Anmeldelser

Ændringer gemt
Ingen anbefalinger at se her!

Kontakt Mahmoud A. omkring dit job

Log ind for at diskutere detaljerne via chat.

Verifikationer

Foretrukken Freelancer
Identitet verificeret
Betaling verificeret
Telefon verificeret
E-mail verificeret
Facebook forbundet
Tidligere Bruger Næste bruger
Invitationen blev sendt!
Tak! Vi har sendt dig en e-mail med et link, så du kan modtage din kredit.
Noget gik galt, da vi forsøgte at sende din mail. Prøv venligst igen.
Registrerede brugere Oprettede jobs i alt
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Indlæser forhåndsvisning
Geolokalisering er tilladt.
Din session er udløbet, og du er blevet logget ud. Log venligst ind igen.