need some one to write about mechanical engineering

Lukket Opslået 7 år siden Betalt ved levering
Lukket

On Paulson’ family trip to the beach, his grandson wanted to stop into a shop. The store was selling a

“really cool” type of binoculars. However, there was a contest to win a “bacon of the month club”

for the entire year and a free pair of binoculars if you can get the optimal amount to order

through-out the year. This is a perfect time to teach his grandson about the EOQ. The

information that the owner was allowed to give you follows:

C The unit cost for the binoculars is $200.

A The cost of ordering a shipment is $100.

I The estimated cost of holding the inventory is 0.05.

λ The annual demand is 2000 units.

Determine:

The Economic Order Quantity (EOQ)

How many orders for the year?

The total cost (K) associated with the binoculars.

7. In general what will the likely impact on LCC if The system MTBM is decreased

Decreased/Increased

8. In general what will the likely impact on LCC if The MDT is decreased Decreased/Increased

9. In general what will the likely impact on LCC if The MLH/OH is increased Decreased/Increased

10. In general what will the likely impact on LCC if System Utilization is increased

Decreased/Increased

11. In general what will the likely impact on LCC if Transportation time is increased

Decreased/Increased

12. In general what will the likely impact on LCC if the factory OEE is increased? Decreased/Increased

13. If you were to implement a supportability analysis effort/approach on a system of your choice,

what steps would you take in accomplishing your objective(s)?

Objectives

Cost reduction throughout the life-cycle is the main focus on what Analysis Tool

• LCCA

• MTA

• LORA

• Evaluation of Design Alternatives

An Ishikawa diagram can be used to facilitate the identification of causes in which Analysis Tool

• FEMCA

FTA

• MTA

• LORA

A deductive approach involving the graphical enumeration and analysis of different ways in which a particular system failure

can occur and the probability of its occurrence.

• FEMCA FTA

• MTA

• LORA

• Evaluation of Design Alternatives

Identification of high-resource consumption areas and the evaluation of those maintenance functions that are to be allocated

to humans is a focus on this Analysis Tool

• LCCA

• FEMCA FTA

• MTA

Evaluation of the system/process, in terms of the lifecycle, to determine the best overall program for preventative

maintenance.

• LCCA

• MTA

• RCM

• LORA

Evaluation of maintenance policies to see if the component should be repaired in house, thrown away, or sent back to the

factory

• LCCA

• MTA

• RCM

• LORA

Evaluation of design configurations using multiple criteria

• LCCA

• RCM

• LORA

• Evaluation of Design Alternatives

What is meant by design criteria? Provide some examples

How are system test requirements determined? What measure would you select and why?

Ingeniørarbejde Java Mekanisk Ingeniørarbejde SQL Teknisk Forfatning

Projekt ID: #11254945

Om projektet

4 bud Remote projekt Aktiv 7 år siden

4 freelancere byder i gennemsnit ₹277/timen for dette job

SCKRamana

I am ready to work on your task per the given requirement and available 24/7 online online for customer support message me we are also available skype/gmail Flere

₹277 INR / time
(47 bedømmelser)
5.1
muradeltaher

my name is murad Mechanical engineer 10 year experience new on freelancer trying it see what will it do for me Autocad 2d 3d MEP HVAC Experience , Technical and Academic Writing i'll send you my CV

₹277 INR / time
(2 bedømmelser)
2.1
victorsaer8

Hello , I am a mechanical engineer with 4 years of experience in the area of mechanical design and mechanical maintenance of machines, I would like to do the job you're selling . I have perfect command of Spanish and E Flere

₹277 INR / time
(0 bedømmelser)
0.0