need some one to write about mechanical engineering
₹100-400 INR / time
On Paulson’ family trip to the beach, his grandson wanted to stop into a shop. The store was selling a
“really cool” type of binoculars. However, there was a contest to win a “bacon of the month club”
for the entire year and a free pair of binoculars if you can get the optimal amount to order
through-out the year. This is a perfect time to teach his grandson about the EOQ. The
information that the owner was allowed to give you follows:
C The unit cost for the binoculars is $200.
A The cost of ordering a shipment is $100.
I The estimated cost of holding the inventory is 0.05.
λ The annual demand is 2000 units.
Determine:
The Economic Order Quantity (EOQ)
How many orders for the year?
The total cost (K) associated with the binoculars.
7. In general what will the likely impact on LCC if The system MTBM is decreased
Decreased/Increased
8. In general what will the likely impact on LCC if The MDT is decreased Decreased/Increased
9. In general what will the likely impact on LCC if The MLH/OH is increased Decreased/Increased
10. In general what will the likely impact on LCC if System Utilization is increased
Decreased/Increased
11. In general what will the likely impact on LCC if Transportation time is increased
Decreased/Increased
12. In general what will the likely impact on LCC if the factory OEE is increased? Decreased/Increased
13. If you were to implement a supportability analysis effort/approach on a system of your choice,
what steps would you take in accomplishing your objective(s)?
Objectives
Cost reduction throughout the life-cycle is the main focus on what Analysis Tool
• LCCA
• MTA
• LORA
• Evaluation of Design Alternatives
An Ishikawa diagram can be used to facilitate the identification of causes in which Analysis Tool
• FEMCA
FTA
• MTA
• LORA
A deductive approach involving the graphical enumeration and analysis of different ways in which a particular system failure
can occur and the probability of its occurrence.
• FEMCA FTA
• MTA
• LORA
• Evaluation of Design Alternatives
Identification of high-resource consumption areas and the evaluation of those maintenance functions that are to be allocated
to humans is a focus on this Analysis Tool
• LCCA
• FEMCA FTA
• MTA
Evaluation of the system/process, in terms of the lifecycle, to determine the best overall program for preventative
maintenance.
• LCCA
• MTA
• RCM
• LORA
Evaluation of maintenance policies to see if the component should be repaired in house, thrown away, or sent back to the
factory
• LCCA
• MTA
• RCM
• LORA
Evaluation of design configurations using multiple criteria
• LCCA
• RCM
• LORA
• Evaluation of Design Alternatives
What is meant by design criteria? Provide some examples
How are system test requirements determined? What measure would you select and why?
Projekt ID: #11254945
Om projektet
4 freelancere byder i gennemsnit ₹277/timen for dette job
my name is murad Mechanical engineer 10 year experience new on freelancer trying it see what will it do for me Autocad 2d 3d MEP HVAC Experience , Technical and Academic Writing i'll send you my CV
Hello , I am a mechanical engineer with 4 years of experience in the area of mechanical design and mechanical maintenance of machines, I would like to do the job you're selling . I have perfect command of Spanish and E Flere