Duration Between Time-stamps Report Automation in Excel

Færdiggjort Opslået 3 uger siden Betalt ved levering
Færdiggjort Betalt ved levering

I'm looking for an expert who can help me streamline the process of time-stamp duration reporting in Excel. The solution I'm seeking should ideally have the following components:

I have a report (excel-sheet) exported from a system that I use in a weekly basis, however in this report, the date and time of processing exported in a form of “timestamp” and in order to calculate elapsed time of each stage in cycle, every time I have to do the followings:

- Fix the format issue in excel since system always export data in a form of “timestamp” and there is no to fix that.

- Exclude non-working hours for each stage/ elapsed time.

- Exclude Weekends (Friday & Saturday).

- Sum up the total of elapsed times

Do you have a solution that I can use the as tool either by creating excel Macro or Power BI, etc that I can use by uploading or copy paste exercise?

Note // please I’m not looking for a one-time report or fixing the uploaded files

Excell File attached 3 sheets (1- the exact report exported 2- report exported with expected results explained 3-Highlights)

The ideal candidate should have a proven track record of working with similar projects, possess advanced skills in Power BI and Excel Macro, and be able to deliver a streamlined solution that not only automates the duration process but also can easily be understood and utilized by others.

Excel Visual Basic Databehandling Power BI

Projekt ID: #38031281

Om projektet

20 bud Remote projekt Aktiv 2 uger siden

Tildelt til:

(310 bedømmelser)
7.1

20 freelancere byder i gennemsnit $33 timen for dette job

faisal9263

Hi, I specialize in creating streamlined solutions for time-stamp duration reporting in Excel Leveraging advanced Excel Macro skills, I can develop a customized tool that addresses your specific needs. This tool will a Flere

$30 USD på 1 dag
(19 bedømmelser)
5.4
MagedAtya

Dear Sir , I have over 12 years of experience in planning and cost control in major industrial projects, and I am a professional in developing schedules on Primavera and preparing various project reports such as dashbo Flere

$50 USD in 2 dage
(2 bedømmelser)
5.1
vw1514518vw

Hello, I understood that you need a reusable tool that you can use anytime to get the required output report automatically, I know what is the challenges and how to get the required report form the raw exported data as Flere

$100 USD in 2 dage
(17 bedømmelser)
4.8
noureen23

Hi There, With 15 years of experience in data applications designing and analytics, I am confident in my abilities to streamline and automate the reporting process you require. I have gone through the attached excel Flere

$30 USD in 7 dage
(13 bedømmelser)
4.3
janita24

Hey , Good afternoon! My name is Jane a skilled Statistician with skills including Visual Basic, Data Processing, Excel and Power BI. I have over 6 years in tutoring visualization (Tableau & Power BI), data analysis Flere

$30 USD på 1 dag
(10 bedømmelser)
3.8
Imtiwrites99

Hey aabarrak, I have carefully read through your project description regarding the automation of time-stamp duration reporting in Excel. I understand that you are looking for a solution that can streamline the process Flere

$15 USD på 1 dag
(2 bedømmelser)
3.0
TayyabDastgir

Hello, Kindly consider initiating a CHAT to transform your aspirations into tangible reality, as I am eager to delve into the intricacies of your project and collaborate effectively to achieve your desired outcome. For Flere

$10 USD på 1 dag
(5 bedømmelser)
3.0
cheungkc

over night 16 hr over 2 nights 24+16 = 40 hr over weekend 48+16 = 64 hr format end time and start time as custom d/m/yyyy h:mm elapsed time = text(end time - start time, "[hh]:mm") if [hh] > 64 then [hh]=[hh]-64 el Flere

$30 USD in 7 dage
(7 bedømmelser)
3.2
jsawant21

Hi There, I understood your requirement clearly, In Highlight Sheet I will give a button, with the click of button ,Sheet Expected result is updated with 'Stage Elapsed time (Per working Hours)' from Col CK and Tota Flere

$32 USD in 2 dage
(5 bedømmelser)
3.0
mian62

Hi I have read the requirements and understand them. I can assure you that if you work with me once, you will always work with me on these kinds of projects. would you like to discuss the project with me?

$10 USD på 1 dag
(8 bedømmelser)
2.3
expertschain

InstantQuality─── ⋆⋅☆⋅⋆ ── I am a specialized Master's degree holder equipped to tackle writing across various subjects. My commitment to work is unwavering, ensuring TOP RATED EXPERT delivers consistent and high-qua Flere

$20 USD på 1 dag
(0 bedømmelser)
0.0
kiran221223

Hello, Since you mention Power BI as one of the tools required, it is possible to extract the timestamps and using Power BI Measures apply the formulas to get the "Stage Elapsed Time". Does help, if we can get on a ca Flere

$20 USD in 7 dage
(0 bedømmelser)
0.0
shravanrao99

Hello there! I am a Power BI developer with over 2 years of experience working with esteemed clients such as Bunge Limited, Veolia UK, etc. creating dashboards of varying complexities and requirements. If you think som Flere

$20 USD in 3 dage
(0 bedømmelser)
0.0