Sample web contract change orderJobs

Filtrér

Mine seneste søgninger
Filtrer ved:
Budget
til
til
til
Slags
Evner
Sprog
    Job-status
    46 sample web contract change order jobs fundet, i prisklassen EUR
    Want change in my Webpage 6 dage left
    VERIFICERET

    Hello, I have a website and I want one of my page of that site Static to Dynamic. HTML code for that page will be given, you have to just make it dynamic and host in my cPanel accordingly. My budget for this project is INR 500 (not per hour) , its total. So, if you can please let me know. Thanks

    €3 / hr (Avg Bid)
    €3 / hr Gns Bud
    18 bud
    change alcatel firmware 6 dage left
    VERIFICERET

    We need an edited version of the alcatel go flip (flip phone) firmware [log ind for at se URL] . Requirements : no browser (if possible no Wi-Fi) : no radio : no video playing : language option must include English : secure not easily hacked (unchangeable) : custom logo on start up and logo wallpaper option : must work with all wireless carriers (preferably if the program unlocks the phone) : ...

    €239 (Avg Bid)
    €239 Gns Bud
    3 bud

    We would like an import script that will create categories and products with colors and sizes (configurable products) and add stock images to them. These will be used as sample data for fashion products on a Magento 1.9.4 installation. Find attached the demo categories and some stock photos you can use for this. You can alter the images to function

    €43 (Avg Bid)
    €43 Gns Bud
    8 bud

    Check page here: [log ind for at se URL] a) Mouse over effect need something like this page. b) Reference info If you have already done show the sample page.

    €15 (Avg Bid)
    €15 Gns Bud
    12 bud

    ...to change the aesthetics of the kitchen I attached. Using that same photo, change texture, colors, brightness. For example my photo has a cream color on floor, doors, and countertop. I need contrast, what about a grey floor, with some dark wood on the low cabinets, and a light finish for the paint on the high cabinets?..and dont forget to change the

    €9 (Avg Bid)
    Garanteret
    €9
    11 indlæg

    I design jewelry & wanted to have CADs made of my pieces so it is ready to send to a manufacturer. I have an entire business, so need someone experienced, accurate, and a good communicator....If so, we'll do plenty of business together. My pieces are earrings, bracelets, necklaces, and rings, and a few accessories too. I will pay per CAD for piece of jewelery completed. Starting with a fe...

    €864 (Avg Bid)
    €864 Gns Bud
    36 bud

    Troubleshoot .Net 4.x customize windows Order Management App connected to Wordpress Woocommerce. Order has stop showing on the App. I can demo the problem see the attached and connect me to understand the problem. Only apply if you have .Net Framework and Wordpress/WooCommerce skills.

    €10 / hr (Avg Bid)
    €10 / hr Gns Bud
    8 bud

    Sample Car Engine Oil Element Analysis Reports required. The car engine oil ( Mobile oil) has grades like SAE 5W20 API SN, In the element analysis report, it shows the percentage of sulphur, zinc, calcium in a particular grade of oil. The Element Analysis report includes Zinc (Zn) (ASTM D4951):* wt. % Calcium (Ca) (ASTM D4951):* wt. % Magnesium

    €58 (Avg Bid)
    €58 Gns Bud
    7 bud

    I am glad you are showing interest to work with me. Please read roject description and submit your bid fi you are agreed with all given terms. So, I am in need of Hiring some responsible and proper writers who would be with me for a long time, as I need regular work done. Terms which you must follow and Agree to bid: You have to be able to write 3000+-4000+ words per day without any issue. You sh...

    €104 (Avg Bid)
    €104 Gns Bud
    31 bud

    I need some one that works with .yaml in order to make a file for me

    €84 (Avg Bid)
    €84 Gns Bud
    2 bud

    We are looking for someone who can process engineering change orders for medical devices.

    €17 / hr (Avg Bid)
    €17 / hr Gns Bud
    9 bud
    Change my website layout 4 dage left
    VERIFICERET

    Right now I have a website which I want the "look" completely changed to look like this blog ([log ind for at se URL]) minus a few things like not having a "shop" and of course transferring all of my content to this new layout.

    €415 (Avg Bid)
    €415 Gns Bud
    114 bud

    The ideal candidate will be responsible for pulling data from various portals and entering that data into rows in excel. The candidate will also have to go into client CRMs and perform specific actions based on the data they're importing to excel. We'll be providing some basic training but you must have basic computer skills and proficiency in excel.

    €19 / hr (Avg Bid)
    €19 / hr Gns Bud
    94 bud

    I am currently using Webmail. Need all emails to be accessed from Gmail account

    €18 (Avg Bid)
    €18 Gns Bud
    9 bud

    I want emails sending to me, but I want the dates on the email backdating to August 2018. You may need to use a mail server for this! Thanks [log ind for at se URL] this is a link to what i want you to do! Thanks

    €23 (Avg Bid)
    €23 Gns Bud
    14 bud

    Integrate Swiggy Order into Desktop Billing Application - MS Access mdb file

    €82 (Avg Bid)
    €82 Gns Bud
    6 bud
    PHP Developer 3 dage left

    As Japanese e-learning company, we have a Learning Management System (LMS) that has to provide with PHP dev...developer as our partner in giving maintenance ・fixing bug・developing new feature of our LMS. We need the developer that can understand Japanese document especially for signing contract and communicate in English with our engineering team.

    €16 / hr (Avg Bid)
    €16 / hr Gns Bud
    84 bud

    ...to a sample website. We run a clothing retail store and we want to develop a good website for the company. I am much impressed with [log ind for at se URL] (sample website). I need a same replica of this website to developed on wordpress. Things to noted. [log ind for at se URL] do not need an e-commerce site so apart from eCommerce i need a skeleton of sample website

    €50 (Avg Bid)
    €50 Gns Bud
    20 bud

    Need to be able to edit fields in a document. I will give specifications via chat. Once completed, the document will be entirely editable as well.

    €307 (Avg Bid)
    €307 Gns Bud
    37 bud

    I have this website which is about selling pendants. It is built using WordPress and woocommerce. The image attached is just a map, where customer will enter any location, then select material and color from drip down as shown. now, when I click next(submit), the exact map location, which the user search, along with the drop-down selected, should be added to cart, ready to be checkout. I will info...

    €37 (Avg Bid)
    €37 Gns Bud
    8 bud

    I WANT TO DEVELOP A WEBSITE IN WORDPRESS. I HAVE SELECTED A SAMPLE WEBSITE FOR REFERENCE. NEED A FREELANCER TO CHECK ON THE SAMPLE WEBSITE AND SHOW A THEME WHICH EXACTLY MATCHES THE SAMPLE WEBSITE SAMPLE WEBSITE - [log ind for at se URL]

    €15 (Avg Bid)
    €15 Gns Bud
    6 bud

    PHP Code Igniter Developer Wanted with GIT experience on Monthly Contract basis (Min 8hrs per day) At-least 2 Years of Experience is Mandatory Mandatory Skill Set: Git Code Management Experience (Must) Code Igniter PHP Framework (Must) Familiar with Agile Process (Must) TFS / VSTS / Azure DevOps (Good to have) Project Management, Requirement Management

    €532 (Avg Bid)
    €532 Gns Bud
    14 bud

    The ideal candidate will be responsible for pulling data from various portals and entering that data into rows in excel. The candidate will also have to go into client CRMs and perform specific actions based on the data they're importing to excel. We'll be providing some basic training but you must have basic computer skills and proficiency in excel.

    €15 / hr (Avg Bid)
    €15 / hr Gns Bud
    52 bud
    Order Entry Form 2 dage left
    VERIFICERET

    I am looking to take this excel document and turn it into a fallible form in excel. If possible I would like to use the forms function but it only allows for a max of 32 rows. 7 days

    €322 (Avg Bid)
    €322 Gns Bud
    48 bud
    SENIOR DEVELOPER 2 dage left
    VERIFICERET

    I need a coder for codeigniter, must be able to code complex , and make controllers/ functions / modals. Be good with [log ind for at se URL] and some design work. start now / lon...a coder for codeigniter, must be able to code complex , and make controllers/ functions / modals. Be good with [log ind for at se URL] and some design work. start now / long term contract

    €6 / hr (Avg Bid)
    €6 / hr Gns Bud
    27 bud
    *china complex logic coder 2 dage left
    VERIFICERET

    I need a coder for codeigniter, must be able to code complex , and make functions/ controllers / modals. Be good with [log ind for at se URL] and some design work. start now / lo...a coder for codeigniter, must be able to code complex , and make functions/ controllers / modals. Be good with [log ind for at se URL] and some design work. start now / long term contract/

    €5 / hr (Avg Bid)
    €5 / hr Gns Bud
    13 bud

    We need a good designer to design a very good and stylish packing box for a ladies trimmer. Need this work to be done as soon as possible.

    €20 (Avg Bid)
    €20 Gns Bud
    11 bud

    Hey everyone! I am on the verge of starting a new website to back my business called "Green Bus...I am on the verge of starting a new website to back my business called "Green Business". So I would need someone to create a logo for me. But before that I would give you a sample, which would allow me to test your creativity. More details in chat. Thanks

    €22 (Avg Bid)
    €22 Gns Bud
    67 bud

    Hey everyone! I am on the verge of starting a new website to back my business called "Green Bus...I am on the verge of starting a new website to back my business called "Green Business". So I would need someone to create a logo for me. But before that I would give you a sample, which would allow me to test your creativity. More details in chat. Thanks

    €68 (Avg Bid)
    €68 Gns Bud
    31 bud

    ...senior Business Consultant with (business) knowledge of Pricing and Quotation GAS for several pending projects on the P&Q engine. Duration Start with 3 months contract (hourly fee) with expectation for 3 years total Location London area, UK Hotel and travelling expenses are paid for. All communication is in English. A professional

    €77 / hr (Avg Bid)
    €77 / hr Gns Bud
    2 bud

    The ideal candidate will be responsible for pulling data from various portals and entering that data into rows in excel. The candidate will also have to go into client CRMs and perform specific actions based on the data they're importing to excel. We'll be providing some basic training but you must have basic computer skills and proficiency in excel.

    €14 / hr (Avg Bid)
    €14 / hr Gns Bud
    27 bud

    ...server all the time. As the response time is high with API level, we were planning to go with sockets. We are looking for experts in socket level programming who can give us sample code on communication between client and server. Following is the workflow : Server opens a socket and its always open. Each client connects to the server socket and retrieves

    €109 (Avg Bid)
    €109 Gns Bud
    5 bud

    This project requires expertise in event driven microservices using spring cloud and involved with Google cloud platforms such as kubernetes cluster and docker.

    €11 / hr (Avg Bid)
    €11 / hr Gns Bud
    18 bud

    We need help to create some 500 images for our books. Job is to look into legacy picture and give them a modern look. We need output in 3 formats, - PSD, JPG and PNG. This is both imitation and creative work . Pls bid for producing 500 images for Biology, Chemistry, Physics etc books. This is Phase 1 only, we might need more images, for which we will pay extra

    €27 - €221
    Forseglet
    €27 - €221
    35 bud

    ...to know code igniter or Laravel to start a project. A developer needs to know Linux server, Plesk. It's very important that the developer knows how to create ethereum smart contract and had to build ICO crowdfunding under ethereum blockchain. Need to design and integrated the site with ethereum blockchain. ICO site needs to be able to convert, exchange

    €1512 (Avg Bid)
    €1512 Gns Bud
    51 bud
    Logo Background change 1 dag left
    VERIFICERET

    I have a main logo, which i need to change with a attractive new looks and trendy. if i like we can continue with more in the future as this and other graphic project

    €20 (Avg Bid)
    €20 Gns Bud
    91 bud

    Good day, I appreciate you showing interest to work with me. But before you bid, I would request you to read project thoroughly and oly to submit your bid if you agree to all. So, I am in need of Hiring some responsible and proper writers who would be with me for a long time, as I need regular work done. Terms which you must follow and Agree to bid: You have to be able to write 3000+-4000+ words ...

    €79 (Avg Bid)
    €79 Gns Bud
    30 bud

    Hello I have Installed Whmcs and HyperV on my server and i have this error [log ind for at se URL]

    €3 / hr (Avg Bid)
    €3 / hr Gns Bud
    7 bud
    Review / write a contract 18 timer left
    VERIFICERET

    I am looking for someone to review a contract for my business.

    €27 (Avg Bid)
    €27 Gns Bud
    30 bud

    Hello, Need a software to do the following: Export Ali-express orders history to an...Ali-express orders history to an EXCEL file, sorted by dates. I need to have the option to choose date ranges to export. Need all information possible (order ID #, item name/description, price each, dates (order, ship, delivered), supplier/store, etc). Thank you.

    €125 (Avg Bid)
    €125 Gns Bud
    6 bud

    HelloYellow, I have few AVI video stream sources but unable to play them via browser FlowPlayer does not accept them If you have an idea how to solve this please write HelloYellow

    €24 (Avg Bid)
    €24 Gns Bud
    3 bud

    HelloYellow, I have few MPEG TS stream sources but unable to play them via browser FlowPlayer does not accept them If you have an idea how to solve this please write HelloYellow

    €29 (Avg Bid)
    €29 Gns Bud
    1 bud

    Need to alter photos by changing the background completely to a new background. The background should be outdoor public backgrounds. They should be real and natural and clicked by normal camera or phones. Also, Want to add objects to the images. The objects added should look real as if they were originally present in the actual image.

    €282 (Avg Bid)
    €282 Gns Bud
    24 bud

    Hi we need a decentralized exchange smart contract built. We also need some customization's which would be above any average solidity developers skill set. We would like someone who has worked on decentralized exchanges, or smart contract development with references to their code. Please ensure when you bid to add that.

    €1098 (Avg Bid)
    €1098 Gns Bud
    38 bud
    Build a sample chatbot design 2 timer left
    VERIFICERET

    Need to re-design the Chatbot for website [log ind for at se URL] You can also use your ideas and change the chat window appearance according to website requirements and submitting us the .css file. Sample Chatbot is attached. The change in wordings will be given. Icons need to be changed.

    €42 (Avg Bid)
    €42 Gns Bud
    2 bud
    Trophy icon Life contract 2 dage left

    Dear all interested ones, I want to review my life contract, actually I did not write it officially before, so I need you to write Life contract for a adult like me in one or two pages according to your best awareness. Attached file may give you some clue that work out for me. You should: - Focus most important responsibility Family care, Individual

    €43 (Avg Bid)
    €43
    4 indlæg