Profilbillede af parillit
@parillit
Flag for Argentina Buenos Aires, Argentina
Medlem siden 14. april 2018
0 Anbefalinger

parillit

Online Offline
ARCHITECT, INDUSTRIAL DESIGNER, SCULPTOR Experience in project area and construction of more than 240 thousand Mts2. Founding President of two construction companies, one of which was one of the works of the largest transportation sector in Latin America, such as La Estación Central Simon Bolivar, with more than 140 thousand mt2 of construction, being a transport complex and significant trade for the region, which was among the 20 most important works in his country Venezuela. In the year 2000 he worked with a North American architecture firm, in charge of the modeling of the urban study of the city of Boston, in the work The Center Artery Tunnel big dig Boston, one of the largest in that country where he worked in the area of modeling of 3D images. It has all the tools and computer programs for the development of 3D images and video editing, among others: Autocad (2d, 3d), sketchup, Vray, 3D Studio Max, Adobe Premiere, Corel Draw.
$125 USD/hr
0 anmeldelser
0.0
  • N/AJobs udført
  • N/AIndenfor Budget
  • N/ATil Tiden
  • N/AGenansættelsesfrekvens

Portfolio

Nylige bedømmelser

Ingen bedømmelser.

Erfaring

GEO AND EOLO SCULPTURE.

Jun 2018 - Aug 2018 (2 months)

Anchipurac Environmental Research Center San Juan, Argentina.

Exhibition stand.

May 2018 - Jul 2018 (2 months)

Location: Madrid, Spain. Construction area: 125mt2 Competition.

Adaptation Project for people with reduced mobility using ramps (URBAN EQUIPMENT)

Sep 2017 - Jul 2018 (10 months)

Location: Buenos Aires Argentina. Experimental steel structure system with flange connections. Articulated structure. Construction area: 250 m2

Rio Reconquista recovery project.

Sep 2017 - Jun 2018 (9 months)

Location: SECTOR RIO RECONQUISTA, Buenos Aires Argentina. Popular Housing. Construction area: 3275mt2

Proyecto y construcción “Vivienda Lomas Country club”

Jan 2017 - Oct 2017 (9 months)

Housing of prefabricated reinforced concrete panels. Barquisimeto, Lara State, Venezuela.

Project "Isla la tortuga"

Sep 2016 - Dec 2016 (3 months)

sla Turtle Ecological Hotel, ultralight type construction and temporary construction. Construction area: 2500 m2.

Project and construction Sistema Bio dome Geodesic "Cabudare"

May 2016 - Jul 2016 (2 months)

House built with the Bio Domos system. Construction area: 28 m2 Cabudare, State Lara, Venezuela.

Project and construction System Bio dome Geodésic "Trujillo".

Mar 2016 - Apr 2016 (1 month)

Construction area: 28 m2 Cabudare, State Lara, Venezuela.

Project Hotel Ritz Barquisimeto, Principal Finishing Advisor.

Feb 2016 - Sep 2016 (7 months)

56 rooms, meeting room, bar restaurant. A.Z Consortium Nueva Segovia Urbanization Barquisimeto, Venezuela.

Project "Municipal Market of Palavecino"

Apr 2015 - Jun 2015 (2 months)

Promoter Mayor of Palavecino. Palavecino Municipality, Lara State, Venezuela. Construction area: 6,934 m2.

Project "Center for the dissemination of alternative energies"

Feb 2015 - Mar 2015 (1 month)

Promoter Mayor of Palavecino. Projected construction with the system Bio domes geodesics, type Bio Climatic fed with a series of panels, photovoltaic and wind generation. It also has waste transformation system with biodigesters. Palavecino Municipality, Lara State, Venezuela. Construction area: 220 m2.

Project and construction system Geodetic dome system "El Hatillo geodesic housing 3"

Jul 2014 - Sep 2014 (2 months)

Experimental system of ultra light structure of aluminum and wood assembled with articulated nodes. El Hatillo Municipality, Miranda State, Venezuela. Construction area: 67 m2

Project and construction of the Biodome Geodetic System "Lomas de Country Club ".

May 2014 - Jun 2014 (1 month)

Housing built with the bio domes and projected concrete system. Construction area: 170 m2 Barquisimeto State Lara, Venezuela.

Project "Aquarium of Barquisimeto"

Mar 2014 - Aug 2014 (5 months)

Promoter Governación del Estado Lara. Botanical Zoo Baradida, Barquisimeto State Lara, Construction area: 2.070 m2

Geodesic domes System Project "Los Teques"

Jan 2014 - Mar 2014 (2 months)

Construction area: 170 m2 Municipality of Los Teques, State of Falcón, Venezuela.

Project and construction Geodetic dome system "Geodetic housing El Hatillo 2"

Jul 2013 - Oct 2013 (3 months)

Experimental system of ultra light structure of aluminum and wood assembled with articulated nodes. El Hatillo Municipality, Miranda State, Venezuela. Construction area: 50mt2.

Project "Eco hotel Jama Isla de Margarita"

Apr 2013 - Jul 2013 (3 months)

Inn of 20 rooms for recreational use and therapeutic use. Construction with the system bio domos geodesics. Peninsula of Macanao Margarita, Nueva Esparta State. Area 5 hectares 2,500 m2 of construction.

Project and construction Geodetic dome system "Santa Rosa geodesic housing"

Jul 2012 - Sep 2012 (2 months)

Experimental system of ultra light structure of aluminum and wood assembled with articulated nodes. Barquisimeto State Lara, Venezuela. Construction area: 67 m2.

Project and construction Geodetic dome system "Geodetic housing El Hatillo"

Apr 2012 - Jun 2012 (2 months)

Experimental system of ultra light structure of aluminum and wood assembled with articulated nodes. El Hatillo Municipality, Miranda State, Venezuela. Construction area: 50 m2.

Project "New Segovia Shopping Center"

Feb 2011 - Sep 2011 (7 months)

Located in the city of Barquisimeto State Lara, Venezuela. Construction area 4500 m2

Stand International Tourism Fair F.I.T.VEN 2010

Oct 2010 - Nov 2010 (1 month)

Pavilions composed by 6 aluminum geodesic domes of 60 ft of diameter and 1040 mt2, for exhibitions of the tourism ministries of: Argentina, Brazil, Bolivia and Ecuador.

"Transbarca" massive transport system of the city of Barquisimeto.

Feb 2005 - Aug 2010 (5 years)

Project that consists of an intermodal station for buses, electric trolleybuses and buses. It also has a shopping center with more than 140,000 m2 of construction, courtyards with workshops for 120 trolleybuses and a main traffic control building for the system of the city of Barquisimeto. The Transbarca project has 66 km of trunk surface roads with 183 km of feeder roads and 44 surface, underground stations.

Industrial design work stand for transbarca.

Oct 2004 - Dec 2004 (2 months)

Promoter mass transport system of Barquisimeto. Fair complex, Barquisimeto state Lara, Venezuela. Area: 100mt2

Project and construction firm Arquitectura Martínez & Parillit. "Bosque Macuto theme park"

Feb 2004 - Nov 2004 (9 months)

Construction of several buildings where stands out, the environmental information center Bio Climatic building, Serpentarium with reptile exhibition areas, zoo and lagoon with tote track, along with 203 hectares of landscaping. Barquisimeto, Lara State, Venezuela. Construction area: 4,000 m2

Project and construction of the main entrance "Complejo Ferial de Barquisimeto"

May 2002 - Sep 2002 (4 months)

Promoter Mayor of Iribarren de Barquisimeto Location East of Barquisimeto, State of Lara Venezuela. Intervened area: 12,000mt2

First prize contest monument 450 years city of Barquisimeto.

Jan 2002 - Aug 2002 (7 months)

Promoter Mayor of Iribarren, Barquisimeto. Polychrome work vibrates rotating wind. 90m high

“The center Artery Tunnel Project big dig Boston”

Apr 2000 - Jul 2001 (1 year)

Boston Massachusetts. E.E.U.U

Agro industrial project "Multi site"

Jan 1995 - Oct 1999 (4 years)

Expansion of food plant, placement of mills, construction of storage cells with silos, load logs. Intervened area: 4,200 m2 Rehabilitation of pigmeat metalworking production workshop. Estimated area: 1700 m2. Sausage factory project Arichuna Palmar group. Works carried out in the states of Lara and Yaracuy Venezuela.

Uddannelse

ARCHITECT

1989 - 1996 (7 years)

Industrial Design Engineering

1994 - 1999 (5 years)

Verifikationer

  • Facebook forbundet
  • Foretrukken Freelancer
  • Betalingsverificeret
  • Telefon Verificeret
  • Identitet verificeret
  • E-mailverificeret

Gennemse lignende freelancere