EXPLORE

Engineering Manufacturing Marketing Project Management Training
Profile cover photo
User Avatar

iyhashmi

@iyhashmi

0.0
0

0.0

0.0

0%

$25 USD / Hour

Flag of

Pakistan (9:20 AM)

Joined on August 2, 2008

$25 USD / Hour

Imran Yousuf Hashmi Objective To obtain a position as an “Engineer” that will use my knowledge, education, skill and practical experience in physical execution of a project, planning ,construction, manufacturing, procurement and maintenance techniques etc. Personal Information Marital Status: Married + One Daughter Nationality: Pakistani Age/Date of Birth: 45 years (August 15, 1962) Place of Birth: Sukkur , Pakistan Father’s Name: USMAN HASHMI (LATE) Passport No. : AC6845111 Education Bachelor of Engineering (B.E. Industrial) Professional Affiliation Pakistan Engineering Council (Registration No. INDUSTRIAL 0046) Languages English, Arabic, Urdu Interest and activities Reading, Fishing, Playing Cricket. Additional professional activities Computer Expertise: DOS, WINDOWS, MS OFFICE, MS EXCELL, PRIMAVERA (Project Planner P3), BAAN & AXAPTA. Training: Fire Fighting System, Fire Extinguishers & Safe Handling of Hazardous Chemicals. ISO 9001:2000 & ISO 14001:1996 (Internal Auditing) Seminars: Bearing ( FAG/SKF), Computerized Mntc. Mngmt. System (CMMS). Water Treatment Plant (DUPONT), Welding Machines & Accessories (ESAB/BOHLER),Atlas Copco Compressors, Power Sweeping Machine(Tennant), Pneumatics (FESTO), CAD/CAM etc. COMPANY ARABIAN CERAMIC MNFG. CO. Al-Khumra District , Jeddah 21573 Kingdom of Saudi Arabia JOB TITLE Project /Construction/ Maintenance /Utilities/Services & Safety Section Head DURATION JUNE 2006 TO DECEMBER 2008 ( 2 ½ Years ) JOB DESCRIPTION PROJECT,CONSTRUCTION, INSTALLATION, OPERATION & MAINTENANCE: Assisted/ coordinated with Italian Technicians for the construction, installation, testing/commissioning & mntc. of Air Compressors ,Air Dryers ,Chiller Plant, Filter Plant, RO Plant Water Desalination Plant, Sewage Treatment Plant, A/Cs,Heating &Ventilating System ,LPG Plant, LPG Vaporizers,Water Station, Fuel station etc. Incharge Fabrication ,welding , Machine & Car Workshop etc. Inspection & Mntc. Of Fire Fighting equipment/ Fire alarm systems/Fire pumps etc.Organized Safety training program for employees. Light & Heavy Equipment/Vehicles maintenance like wheel loaders, forklifts, dozers, trucks, water tankers, cars, buses , power sweepers etc. COMPANY SAUDI CERAMIC COMPANY LTD. (ISO 9001 & 9002 Certified) P.O. Box 40487, Riyadh 11499 Kingdom of Saudi Arabia DURATION JANUARY 1992 TO APRIL 2006 ( 14 years 4 months ) JOB TITLE a) Mechanical Maintenance Dept. Head --(Engg. Dept.) b) Design, Material & Archive Section Head – (Engg. Dept.) c) Auxiliary maintenance Department Head – (Engg. Dept.) d) Development & Tech. Services Dept. Head – (Engg. Dept.) JOB DESCRIPTION § § Preparation of Feasibility Study /cross section of mini Projects i.e. water treatment plants, filtered/recycled water, Fire water, compressed air, Gas, Oil, Steam & sewerage piping networks. Compressor, & Water Stations etc. § Assisted Italian & German Technicians in supervising construction, erection/installation, testing & commissioning of Saudi Ceramic Tiles & Sanitary Ware expansion project.The main equipment were refire/shuttle kilns (Heimsoth –Germany), Beam Casting (Thermic Design-UK)/Pressure Casting Machines (Sacmi-Italy). Complete Ceramic Plant ( Saudi Ceramic- Second Factory project TSC & Sacmi, Italy). § Supervised Natural Gas Conversion Project. Complete piping network erection, installation, Radiographic, Hydro & Tightness testing and Commissioning. § Responsible for metal, composite fabrication/assembly, structural assembly, welding shop, carpentry shop, refractory, Lining & civil/ construction works. § Maintenance of underground / overhead water, air, oil, fuel, gas (Natural/LPG), steam & sewage piping network i.e. steel, Galvanized, PVC pipe etc. § Responsible for trouble shooting/preventive maintenance of complete ceramic plant equipment like Crushers, Ball Mills, Elevators, Silos, Dryers, Blowers, Boilers, Compressors, Tunnel Kilns, Shuttle kilns, Transporting lines, Filter Press, Conveyors, Hoisters, Laser Guided Vehicle, Auto sprinkler system (Fire Fighting System), Pumps, Stirrers, Blungers & Oil/gas/fuel/water storage tanks etc. § Production & maintenance of Treated water (RO Plant) water Purification (recycled) plants. § Responsible for periodic inspection of plant’s equipment/machineries as per the inspection check lists and keeping vibration monitoring history record thru using of SPM & Vibration Meter. § Routine testing/inspection of Fire Pumps, Fire Fighting equipment, Fire Alarm Systems, Smoke & heat detectors etc. § Monthly inspection of Natural Gas piping network, Metering skid, Safety valve, Pressure Regulators, Flow meters by multi-gas detector instrument. § Preparation of Preventive maintenance weekly, monthly, quarterly and yearly plan/schedule based on the equipment History & CMMS application. § Data collection and record maintaining of Monthly trouble shooting & Prev. Mntc Jobs. Preparation of Equipment downtime analysis report. Keeping record for Calibration of Safety valves, testing & Measuring Instruments, Pressure Gauges etc. § Study, monitoring & collection of spare parts consumption/requirement data & fixed Reorder levels. § Material request Preparation, & correspondence with local/foreign suppliers, computation of offers, supplier’s selection & follow-up. § Procurement of mechanical, electromechanical, instrumentation,common and safety items as per DIN, ISO, AISI, NFPA & BS Standards. § Team Member of ISO-9001:2000 & Environmental Management System ISO-14001:1996 internal auditing team. Carried out study for Controlling Pollution like dust, heat, waste emission & Improving environmental situation inside the plant. § In charge Tech. Library/Archive containing drawings, documents, catalogues for the Plant Equipment/machineries. COMPANY SHABBIR TILES & CERAMICS LTD. LANDHI, KIRACHI,,PAKISTAN DURATION May 10, 1991 – December 1991 ( 6 Months ) JOB TITLE SHIFT MANAGER ( PRODUCTION & MAINTENANCE) JOB DESCRIPTION § Responsible for Production & Maintenance of Ceramic Tiles and Sanitary wares manufacturing plant of various sizes, designs & models etc. COMPANY ESSA CEMENT INDUSTRIES LTD. Nooriabad, Karachi, Pakistan DUARATION JULY 16, 1987 TO APRIL 30, 1991 ( 4 years ) JOB TITLE PROJECT, PLANNING,CONSTRUCTION, ERECTION, INSTALLATION, PRODUCTION & MAINTENANCE ENGINEER JOB DESCRIPTION § Preparation of Contracts, tender documents, bill of Quantities (BOQ), insurance reports & claims etc. § Material request preparation, ordering, inspection & storing in warehouse. § Under the Supervision of Chinese Tchnicians carried out erection, installation, testing, commissioning, production & maintenance of complete dry process Cement plant Make FULLER-USA & CHMC-CHINA. § The main eqpt. were Crusher, Stacker/Reclaimer, Belt Conveyors Elevators, Silos, Ball Mills, Cyclones, Pre-calciner, Rotary Kiln, Grate cooler, Drag chain, Screw/bucket conveyors, ID Fan, Dust collectors ,Rotary valves, Fans, Blowers, Air Slides, EP etc. References 1) Mr. Saleem Lakhani (GM Tech./Admn.) Essa Cement (Mob. 0092-3008248309) 2) Mr.Fateh Mohammad (Plant Manager) Shabbir Tiles (Mob.0092-3008259772) 3) Mr.Hamad Migrin Al-Sheikh (GM Saudi Ceramics, Mob.00966-505402911) 4) Mr.Ibrahim Osman (Prod/Mntc.Mngr. Saudi Ceramics, Mob.00966-503108201) 5) Mr.Abdussalam Kabaili (Mntc.Mngr. Arabian Ceramics Mob.0021-254684159 & 0039-3387987832

0.0 · 0 Reviews
Reviews

No reviews to see here!

Verifications

Registered Users

Total Jobs Posted

Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)

Copyright © 2025 Freelancer Technology Pty Limited (ACN 142 189 759)