EXPLORE

Accounting Copywriting Data Entry Engineering Project Management
Profile cover photo
User Avatar

Danushka A.

@danu141

0.0
0

0.0

0.0

0%

Civil Engineer, BSc Eng. (Hons), MSc (PM), MBA

$15 USD / Hour

・

Flag of

Sri Lanka (5:57 AM)

・

Joined on April 30, 2009

$15 USD / Hour

・

DANUSHKA D.M. Project Manager | MSc (Reading) | MBA (Reading) |BSc Eng. (Hons) | GMICE (UK), AMIESL | Over 16 years of experience in the field of Civil Engineering Projects, including feasibility studies, designing, planning, optimization, procurement, construction, and commissioning in field of Civil Engineering and Power Sector Sri Lanka. SPECIALTIES: ▪ Project designing, Planning, Approving, and Implementing the projects. ▪ Preparation of Project programs, activity schedules, resource allocation plans and achieve the project target by identifying the critical path activity using software called MS Project and PRIMVERA. ▪ Procurement work related to the work Contracts including estimation, preparation of Bill of Quantities, bid drawings, specifications, engineer’s requirements, and other relevant Documents for bidding. ▪ Experience in handling of construction matters by following governed Condition of Contract (ICTAD & FIDIC). ▪ Familiar with Quality Assurance/Quality Control procedures in construction industry. ▪ Experience in evaluating of EOT claims, cost claims, variation orders and process to Client’s approval. ▪ Experience in preparation of interim and final payment certificates with relevant supporting documents.

Reviews
0 Reviews

No reviews to see here!

Experience

Ceylon Electricity Board

Aug, 2016 - Present

•

9 years, 10 months

Project Manager

Feb, 2020 - Present

•

6 years, 4 months

Some of the design changes were incorporate due to the functional failures while operating the plant. I was identified those failures and give the solutions to recover the problems. I have been appointed as Project Manager of for the project of Enhancing the Capacity of Coal Yard which was identified that the existing Coal Yard capacity cannot bare the required quantity in the plant. Total Project cost is equal to USD 32 million.

Project Manager

Jun, 2018 - Jan, 2020

•

1 year, 7 months

To control and mitigate the fugitive dust emission through Coal and Ash Yard, I have proposed wind barrier considering the wind design and other parameters. I was attending to the design, procurement, and implementation of this project. I was appointed as Project Manager When construction was started. Total Project cost is equal to USD 6.2 million.

Design Engineer

Aug, 2016 - Jun, 2018

•

1 year, 9 months

I have great opportunity me to attend design works. I have carried out following designs after attached to this post, Wind Barrier USD 6.3 Million Ware House for Boiler Section USD 0.2 Million Ware House for Turbine Section USD 0.2 Million Boundary wall and Gate House USD 0.6 Million Workshop and office building facilities including infrastructures USD 1.8 Million etc..

Aug, 2016 - Present

•

9 years, 10 months

Education

University of Peradeniya

2020 - 2022

•

2 years

MSc (Project Management)

Flag of

Sri Lanka

2020 - 2022

•

2 years

Wayamba University of Sri Lanka

2017 - 2022

•

5 years

MBA

Flag of

Sri Lanka

2017 - 2022

•

5 years

University of Peradeniya

2001 - 2006

•

5 years

BSc (Engineering)

Flag of

Sri Lanka

2001 - 2006

•

5 years

Verifications

Registered Users

Total Jobs Posted

Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)

Copyright © 2026 Freelancer Technology Pty Limited (ACN 142 189 759)