EXPLORE

Engineering Project Management
Profile cover photo
User Avatar

Ashok K.

@akmittalsapna

0.0
0

0.0

0.0

0%

Flag of

India (8:33 AM)

Joined on March 17, 2008

Curriculum Vitae ASHOK KUMAR MITTAL EDUCATION [login to view URL] (ENGG) MECHANICAL 1980 PERSONAL PROFILE DATE OF BIRTH : 17 SEPT 1958 TEL ® : TEL (O) [login to view URL] ® [login to view URL] MOBILE: [login to view URL] PASSPORT NO. : Z 2668088 VALID UPTO 04/8/2023 STATUS : MARRIED ADDRESS D-43 IFFCO TOWNSHIP BAREILLY 243403 E Mail ID: INDIA SKILLS Contract Administration, Maintenance planning, Project implementation COMPUTER KNOWLEDGE : 1. CONVERSANT WITH MSOFFICE i.e. MSEXCEL, MSWORD,LOTUS123 2.WORKING EXTENSIVELY ON MSPROJECT FOR PLANNING ,MONITORING, OF PLANT SHUT DOWN & BREAKDOWN ACTIVITIES DESIGNED INTEGRARED PLANT MAINTENANCE MANAGEMENT SYSTEM WHICH WAS IMPLEMENTED IN ALL UNITS OF IFFCO. CARRIER PROFILE (EXPERIENCE): Presently working for IFFCO canada (for setting of ammonia urea complex in canada). Job involves preparation of NIT for EPC and EPCM contractor. A MECHANICAL ENGINEER WITH MORE THAN 33 YEARS OF EXPERIENCE IN PROJECT & MAINT IN MAINLY GAS PROCEESING PLANT I.E. N.G,AMMONIA –UREA PLANTS. MY BACKGROUND INCLUDES CONTRACT ADMINISTRATION, PROJECT IMPLEMENTATION AND MAINTENANCE. I HAVE COORDINATED AMMONIAPLANT PROJECT SINCE CONTRACT PREPARTION TO HANDOVER OF PROJECT. VERY STRONG IN COMMERICAL MATTERS. IN MAINTENANCE SIDE MY THRUST AREA IS TROUBLE SHOOTING AND MAINTENANCE FREE PLANT. THIS IS POSSIBLE BY CONTINOUS IMPROVEMENT OF MAINTENANCE PRACTICES AND STUDY. I HAVE SOLVED MANY CHRONIC PROBLEMS OF MACHINES WHICH COULD NOT BE SOLVED BY OEM. KNOWLEDGE OF INTERNATIONAL STANDARDS i.e. TEMA, ASME, API ETC PROCUREMENT GEN. ENGG. ITEM FOR PLANTS,CONTRACTS FOR HIRING MANPOWER,FABRICATION OF STEEL STRUCTURE WORK, PIPING FABRICATION, INSULATION,EXPERTISE MANPOWER,PAINTING WORKS OF PLANTS, OVERHAULING OF ROTATING MACHINES, OVERHAULING OF GAS TURBINES, REPAIR OF VALVES,PSV TESTING, RETUBING OF EXCHANGERS AND OTHER CONTRACTS FOR SHUTDOWN JOBS ANNUAL SHUTOWN PLANNING ,MONITORING,ARRANGING RESOURCES. TROUBLE SHOOTING AND MODIFICATIONS TO IMPROVE RELIABILITY. DESIGNED INTEGRARED PLANT MAINT MANAGEMENT SYSTEM WHICH WAS IMPLEMENTED IN ALL UNITS OF IFFCO.UNIFORM CODIFCATION OF SPARES IN ALL IFFCO UNITS(MECH ITEMS). PREPARATION OF MAINTENANCE BUDGET, COST CONTROL, INVENTORY CONTROL AND KNOWLEDGE OF INTERNATIONAL CODES AND STANDARDS. A TEAM OF 20 ENGINEERS , 80 WORKMAN AND 200 CONTRACT PEOPLE IS WORKING WITH ME. 1. PRESENTLY WORKING IN IFFCO AONLA UNIT)-LARGEST FERTILISER COMPANY MANUFACTURING AMMONIA & UREA (TO TOTAL PRODUCTION MORE THAN 6 MILLION MT/YEAR) AS DEPUTY GENERAL MANAGER (MECH) LOOKING AFTER MAINTENANCE OF AMMONIA1 AND II , POWER PLANT, UTILITIES i.e DM WATER PLANT , COOLING TOWERS, RAW WATER SYSTEM, EFFLUENT, PLANT & INSTRUMENT AIR SYSTEM , IG PLANT ETC. SOME OF RECENT MODIFCATIONS:(LAST YEAR) A. MODIFCATION OF OIL SEAL TO PREVENT OIL LEAKAGES WHICH WERE PERISTING FOR LAST 17 YEARS. OEM COULD NOT SOLVE THIS PROBLEM B. HIGH VIBRATIONS IN MULTISTAGE PUMP BY USING NON METALLIC WEAR PARTS ETC C. RETROFITTING OF EXCHANGERS. D. PROVIDING WATER COOLED INTER COOLER IN PASSIVATION HP AIR COMPRESSOR OF UREA PLANT. RECENTLY COMPLETED MAJOR OVERHAUL OF GASTUBINE FRAME –5, RLA STUDY OF BOILERS AND HEAT RECOVERY UNITS. 2. WORKED FOR HALDOR TOPSOE DENMARK FOR AMMONIA PLANT-1350MTPD AT AONLA &PHULPUR AS CONTRACT ADMINISTRATOR/AREA MANAGER FROM DEC93 TO MARCH 98. WORK INCLUDES PREPARATION OF CONSULTANCY CONTRACTS,ITB PREPARATION,BID EVALUATION,REVIEW OF DRAWINGS/ DOCUMENTS, PROCUREMENT, , EXPEDITING OF MATERIAL , AWARDING CONTRACTS, SUPERVISION OF CONSTRUCTION, CONTARCTS IMPLEMENTATION-BILLS, EXTRA CLAIMS, AMMENDMENTS ETC TILL HANDING OVER OF AMMONIA PLANTS OF1350 MTPD CAPACITY. 3. WORKED AS DY MANAGER(P) AT IFFCO NEW DELHI -CORP. OFFICE FOR AMM STORAGE., UREA HYDROLYSER PROJECTS FROM SEPT90 TO DEC 93. 4. WORKED AS ENGINEER (Rotating Machines) AT MINISTRY OF INDUSTRIES (FERTILISER PROJECTS COMMISSION) BAQHDAD IRAQ FOR AL-KAIM PROJECT. JOB INCLUDES ITB PREPARATION REVIEW OF SPECIFICATIONS OF EQUIPMENTS FOR SULPH ACID PLANT, PHOSPHORIC ACID PLANT, UTILITIES ETC SEPT89 TO SEPT 90.(TURNKEY PROJECT) 5. WORKED AS DY MANAGER(P) AT IFFCO NEW DELHI -CORP. OFFICE IFFCO KALOL UNIT FOR REVAMPING OF REFORMER, ERECTION OF CO2 COMP., FOR UREA PLANT,NATURAL GAS COMP.OF AMM PLANT, REPLACEMENT OF AGED EQPT.. &MAINT. OFAMMONIA PLANT. FEB. 81 TO AUG. 89.JOB INCLUDES ITB PREPARATION, EVALUATION OF BIDS,AWARDING WORK, SITE SUPERVISION,COMMISIONING ETC. TECHN PAPERS: 1.PUBLISED FOLLOWING TECH PAPERS IN CHEMICAL ENGINEERING MCGRAW HILL PUBLICATION USA. A “ UPRATING OF EXISTING BELT CONVEYORS”. B “ PROTECT TURBOMAHINES FROM ELECTROMAGETISM”. 2. RECEIVED CERTIFICATE OF RECOGNITION FOR TECHNICAL PAPERS. 3. PRESENTED PAPER IN FAI SEMINAR FOR MAINT MANAGERS ON “ SPARE MANAGEMENT AND INVENTORY CONTROL”

0.0 · 0 Reviews
Reviews

No reviews to see here!

Verifications

Registered Users

Total Jobs Posted

Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)

Copyright © 2025 Freelancer Technology Pty Limited (ACN 142 189 759)