I gang

The first month work

Hello Mr. Sunjay!

Here is a list with the pages we want you to work with the first month. Please start with making links from PR 3 and 4 to as fast as possible get the pages highly ranked and then following months use lower PR pages to sustain the high rank.

Remember what I wrote that we dont want anymore then five links per day on each page.

It must look natural to avoid Google sandbox.

If its possible, we want a small report every week to check progress.

I send you the file with the sites on Skype

Færdigheder: Link Bygning

Se mere: sustain, month work, work progress, want google sandbox, start report work, 160 hours work month, google rank fast, work month, google check work , developer hours work month, look poi points google, week month, links per month, fast rank google, appear google front page, google xml page

Om arbejdsgiveren:
( 44 bedømmelser ) Bjurholm, Sweden

Projekt-ID: #4050428

Tildelt til:

dynamitewebsol

Hired by the Employer

$500 USD in 30 dage
(159 bedømmelser)
7.0