Annulleret

WBS for project

1-Effort P-m

2-Number of peple

3-Cost in money

4-Duration Using:

a-LOC

b-Functiontion point

c- Cocomo model

You can determine which programming language is appropriate to calculate the number of lines of code and the assumption of auxiliary data for the account...

Færdigheder: Projekt Ledelse, Software Arkitektur, Software Udvikling

Se mere: work breakdown structure template word, wbs project management examples, work breakdown structure construction, work breakdown structure for building a house, work breakdown structure template excel, work breakdown structure software, how to create a work breakdown structure, work breakdown structure pdf, data mining apriori code

Om arbejdsgiveren:
( 34 bedømmelser ) Medina, Saudi Arabia

Projekt-ID: #14871611

2 freelancere byder i gennemsnit $63 for dette job

hany74

Hello, I'm a mechanical engineer with project management background, utilizing Primavera P3, P6 and MS Project. Relevant Skills and Experience I have more than ten years of experience in planning and scheduling proje Mere

$61 USD in 10 dage
(33 bedømmelser)
4.7
$65 USD in 7 dage
(0 bedømmelser)
0.0