civil engineering project (any traffic, transport or highway engineering related project)

I gang Opslået 6 år siden Betalt ved levering
I gang Betalt ved levering

the report must be free of pligersim consist of the main elements of general final year project i.e abstract, intro etc...

WORDS COUNT BETWEEN 8000 AND 10000

if possible to choose between these two subjects

1development of robotic bridges.

2pavement surface unevenness evalution.

IN THE FILE ATTACHED BELOW CLEAR STEPS AND ELEMENTS OF WHAT THE REPORT SHOULD CONSISTS OF

Civil Ingeniørarbejde Rapport Skrivning Strukturelt Ingeniørarbejde

Projekt ID: #13886794

Om projektet

7 bud Remote projekt Aktiv 6 år siden

Tildelt til:

£372 GBP in 3 dage
(60 bedømmelser)
5.8

7 freelancere byder i gennemsnit £167 timen for dette job

danielingenieria

I am engaged in structural design (concrete, steel and wood), architectural design of residential, public and comercial buildings. I can create for you 2D CAD drawings, 3D architectural modelling in AutoCAD, 3ds MAX, Flere

£222 GBP in 2 dage
(13 bedømmelser)
4.7
iddareen

I have gone through your requirements and I believe am the best suited candidate for this task. I have done numerous papers such as this one and I will be glad to offer my expertise and skills on your project. With me Flere

£38 GBP in 3 dage
(23 bedømmelser)
4.2
mzdesmag

Dear client we can provide complete solution on your project as we have executed it before. Our commitment lies in honesty, integrity, ethical code of conduct, efficiency and speedy respond, we love to work hard to Flere

£38 GBP på 1 dag
(3 bedømmelser)
2.6
piyag476

If you want readable, engaging and accurate copy, then look no further. Whether I am writing or editing, I seek to paint words with vivid brush-strokes, tapping into ideas through images; feelings through sensations; f Flere

£150 GBP in 3 dage
(3 bedømmelser)
0.7