I’m in the planning phase of a new high-voltage substation build and need a seasoned scheduler to turn our engineering and procurement strategy into a transparent, logic-driven baseline in Primavera P6. The core of the work is two-fold: first, craft a complete timeline that reflects HV substation realities—long-lead equipment, outage windows, energisation milestones—and, second, run a thorough schedule quality-assurance pass (DCMA 14-point or equivalent) to prove the programme is sound. Although the master file will live in P6, familiarity with MSP is useful because part of the QA involves cross-checking imported data sets for consistency. Deliverables • Level 2/3 baseline schedule in Primavera P6 (.xer) plus PDF and XLS extracts • QA report highlighting all metrics checked, with recommendations for any corrective actions • Brief narrative outlining critical path, float drivers, and key assumptions Acceptance criteria: the schedule must be logically linked, free of open ends and date constraints, pass agreed QA thresholds, and be ready for executive sign-off. If you’ve built or audited schedules for electrical transmission or substation projects before and can start quickly, I’d like to hear how you would approach this assignment.
Project ID: 40645578
16 proposals
Remote project
Active 30 mins ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
16 freelancers are bidding on average $54 USD/hour for this job

Hi there, We will produce a logic-driven Primavera P6 baseline schedule for the HV substation build, with linked long-lead equipment, outage windows, energisation milestones, and the PDF/XLS extracts you need for review. We will then run a DCMA 14-point or equivalent QA pass and provide a concise narrative on critical path, float drivers, and key assumptions. We have public Freelancer review history covering GRC, healthcare research and regulated-sector analysis engagements. Best Regards, 8veer
$550 USD in 20 days
5.6
5.6

As an experienced electrical engineer with a strong background in project management, I am confident that I possess the skills required to fulfill your HV Substation Primavera Scheduler needs. My familiarity with industrial automation and energy systems, including my mastery of Siemens TIA Portal, Simatic Manager, WinCC SCADA and the PH & Information Server programs, make me very comfortable working with Primavera P6 and MSP. The fact that I have managed projects in various industries such as wastewater treatment plant and water treatment plant automation proves that I can adapt well to any project requirements. I am a detail-oriented professional who believes in thoroughness, making sure that all metrics are checked and data consistency across imported data sets. This makes me a strong fit for the task of crafting a transparent timeline reflecting HV substations realities and conducting schedule quality-assurance using DCMA 14-point or equivalent approaches. In summary, my extensive experience in the field of industrial automation, process automation, instrumentation as well as in writing software and managing electrical projects makes me the best choice for your HV Substation Primavera Scheduler
$12 USD in 40 days
5.0
5.0

I am Civil Engineer PMP CERTIFIED and MBA ,I have over 12 years of experience in planning and cost control in major industrial projects, and I am a professional in developing schedules on Primavera and Microsoft Projects preparing various project reports such as dashboards in all its forms. I am confident that I have the skills and experience you are looking for.
$65 USD in 40 days
3.9
3.9

Hello, I’m experienced in Primavera P6 and MS Project and can develop and review a logic-driven baseline schedule for your HV substation project. I can handle activity sequencing, WBS, critical path, float analysis, long-lead equipment, milestones, and schedule QA using DCMA 14-point or equivalent checks. I can deliver the P6 .xer schedule along with PDF/XLS extracts, QA report, and a clear narrative of critical path and key assumptions. I’m available to start quickly and can provide a professional, well-structured schedule ready for review.
$10 USD in 20 days
0.8
0.8

I've built and audited Level 2/3 baseline schedules for HV transmission and substation projects in Primavera P6, so I can move straight into your engineering-to-procurement logic without a learning curve. My approach: Discovery – review your current E&P strategy, long-lead equipment list, and outage/energisation constraints to map the full scope of activities. Build the baseline – construct a fully logic-linked P6 schedule (no open ends, no hard constraints), sequencing engineering, procurement, construction, testing, and energisation milestones with realistic long-lead durations. QA pass – run a full DCMA 14-point check (logic %, leads/lags, hard constraints, high float, negative float, high duration, invalid dates, resources, missed tasks, critical path test, CPLI, etc.), document results, and correct any failures before delivery. MSP cross-check – validate any imported datasets against the P6 file for consistency. Deliverables – .xer file, PDF/XLS extracts, a QA report with corrective actions, and a short narrative covering critical path, float drivers, and key assumptions. I can start immediately. Expect a first-pass baseline within 3–4 working days for your review, with the full QA-cleared schedule ready for executive sign-off within 5–7 working days total.
$45 USD in 40 days
0.0
0.0

Yes, I can do it for you. I can build a logic‑driven Level 2/3 baseline in Primavera P6 that reflects the realities of HV substation projects—long‑lead equipment, outage windows, and energisation milestones—and then run a full DCMA 14‑point quality check to ensure the programme is sound. You’ll receive the .xer file along with PDF and XLS extracts, a QA report with metrics and recommendations, and a concise narrative outlining the critical path, float drivers, and key assumptions, all ready for executive sign‑off.
$15 USD in 40 days
0.0
0.0

YOUR PROJECT IS EXACTLY THE TYPE OF WORK I SPECIALIZE IN. I understand the importance of creating a transparent, logic-driven baseline for your HV substation project. Your focus on long-lead equipment and energisation milestones is critical for success. With extensive experience in Primavera P6 and several successful electrical transmission schedules under my belt, I can ensure your timeline meets all QA standards, including the DCMA 14-point check. You can view my prior work on similar projects in my portfolio for reference. I’d love to chat about your project. Worst case, you walk away with a free consultation and a few useful ideas. Regards, Kristian.
$8 USD in 4 days
0.0
0.0

Dear Client, I’m interested in working on your project. I have the skills and dedication needed to complete the work carefully and on time. I understand the requirements and will make sure the final result meets your expectations. I’m also happy to communicate throughout the project and make reasonable revisions if needed. Thank you for considering my proposal. I look forward to working with you. Best regards, Said
$25 USD in 40 days
0.0
0.0

Having carefully reviewed your project details, I would like to first introduce myself. I am Eng. Mohamed Youssry Khalil, a Project Management and Planning Engineer. I have been working in the field of project management, planning, and scheduling since my graduation in 2017, extensively utilizing Primavera P6 and MS Project. I am also proudly certified as a PMP (Project Management Professional) and PMI-SP (Scheduling Professional). I would like to offer my services to successfully deliver your project. My proposal to execute this assignment is as follows: Baseline Development: I will craft a complete, logically linked Level 2/3 baseline schedule in Primavera P6 that accurately reflects the realities of HV substation construction, properly mapping out long-lead equipment, outage windows, and energisation milestones. Quality Assurance: I will conduct a thorough schedule QA pass (DCMA 14-point criteria) to ensure the programme is sound, logically driven, and completely free of open ends and hard date constraints. My strong background in MS Project will also ensure smooth cross-checking of any imported data sets. Comprehensive Deliverables: I will submit the master Primavera P6 schedule (.xer), along with the required PDF and XLS extracts. Please note that I am fully committed to revising and modifying the work based on your feedback, or any comments from the consultant, until the schedule passes all QA thresholds and is entirely ready for executive sign-off.
$15 USD in 35 days
0.0
0.0

PMP-certified scheduler (16+ years EPC/mining/infrastructure, Southern & East Africa) — currently Senior Specialist Scheduler , plus my own P6 consultancy. Approach: Build Level 2/3 baseline in P6 reflecting long-lead equipment, outage windows, and energisation milestones — fully logic-linked, no open ends or hard constraints. 3 review checkpoints with you (logic check, draft critical path, pre-QA final). Run DCMA 14-point QA/QC with corrective-action log. Deliver P50/P80 schedule risk analysis, Schedule BoS, and narrative on critical path/float drivers/assumptions. Deliverables: P6 baseline (.xer + PDF/XLS), QA report, P50/P80 report, Schedule BoS, narrative — ready for exec sign-off. Why me: Hands-on P6 + MSP, forensic CPM audit experience under FIDIC/NEC/JBCC, current large-scale mining/infrastructure scheduling exposure. Available to start now — happy to align on timeline and rate.
$12 USD in 40 days
4.1
4.1

I do have good experience in P6 and would like to try your work out ! From creating baselines to updating and monitoring with impact programs - I have sufficient experience for all this
$14.50 USD in 22 days
0.0
0.0

I am a highly experienced Planning and Scheduling Specialist/Consultant and have prepared schedules for many HV substations as part of major oil & gas and industrial facilities. After interviewing the Project and Construction Managers, Primavera P6 will be used to prepare the schedule. When a draft schedule is prepared it will be subject to the following review: My review process starts with a first-pass DCMA 14-point analysis, then goes deeper into judgement-based checks: - Basis of Schedule/Schedule Narrative: - Completeness: I verify that the schedule addresses the entire scope of work at the requisite level of detail. - Critical Path: Identify the longest path. Review its logic and resources - Logic: I confirm logic is complete end-to-end, principally FS relationships, minimise SS relationships. - Lags: I lags will be short with an obvious, demonstrable need. Longer lags only if unavoidable, negative lags will not be used.. - Resources: I review resource allocation, levelling and constraints. - Float: I treat float as only meaningful when it comes from a properly resource-loaded schedule. Any logic added purely to reflect resource levelling will be logged. - Deviations: Any deviation the DCMA metrics flag is reviewed for reasonableness rather than mechanically corrected. Actions to correct will be logged. - A copy of the project will be exported into .XML format and reviewed in MS Project to ensure consistency.
$50 USD in 40 days
0.0
0.0

I’m interested in this because a substation schedule needs to reflect how the work is actually built, not just produce a sequence of dates. I can build and QA a Level 2/3 Primavera P6 baseline around engineering, procurement, construction, outages and energisation, with the logic needed for executive review. 1. Review the WBS, engineering/procurement strategy, key dates, calendars and project constraints. 2. Build the P6 logic network, including long-lead transformers/switchgear, design approvals, factory testing, delivery, outages, installation, testing and energisation. 3. Establish the baseline and provide the .xer, PDF and XLS extracts. 4. Run a DCMA 14-point or equivalent QA review, checking logic, open ends, constraints, durations, leads/lags, float and relationship quality. 5. Cross-check imported data in MSP where required and reconcile inconsistencies. 6. Deliver the QA report plus a concise narrative covering critical path, float drivers, assumptions and corrective actions. I’ll pay particular attention to procurement-to-site dependencies and outage/energisation logic. These are common places where a schedule can appear complete while hiding unrealistic handoffs or excessive float. The biggest risk is a technically correct schedule that does not reflect actual field and outage constraints. I’ll control that by validating the logic against the engineering, procurement and construction sequence before presenting the baseline for sign-off.
$8 USD in 10 days
0.0
0.0

Dear Sir/Madam, I am a Civil Engineer and Primavera P6 Scheduler with experience in construction planning, scheduling, progress monitoring, and project controls. I am interested in working on your HV Substation Primavera Scheduling project. I can develop and maintain a professional Primavera P6 schedule, including: WBS and detailed activity development Activity durations and logical relationships Baseline schedule preparation Critical Path and Float analysis Engineering, Procurement, Civil, Electrical & Commissioning activities Resource and cost loading, if required Progress updating and schedule control Planned vs. Actual progress S-Curve and progress reports 2-week/3-week look-ahead schedules Delay and recovery schedule analysis Weekly and monthly schedule updates I understand the importance of proper sequencing and coordination between civil works, HV equipment installation, cabling, protection & control, testing, commissioning, and energization. I can start immediately and will provide a well-structured, logically linked and easy-to-update P6 schedule according to your project requirements. Please share the project scope, BOQ/drawings, specifications, and required schedule duration so I can review them and proceed accordingly. Best Regards, M. Seemab Civil Engineer | Primavera P6 Scheduler
$12 USD in 40 days
0.0
0.0

Hands on experience in planning and scheduling using primavera and already made 3 substation in single project currently working with, timely project completion with practical planning , skills like MS PROJECT AND PRIMAVERA P6 is a Plus. Will be 24*7 individually available for querry and solutions.
$12 USD in 40 days
0.0
0.0

Hello, I’m an Electrical Engineer and Infrastructure/Energy professional with experience in electrical projects, infrastructure planning, project coordination, technical documentation, and engineering consultancy. I’m interested in supporting your HV substation scheduling assignment. I can develop a structured Level 2/3 baseline covering engineering, procurement, construction, testing, commissioning and energisation, with appropriate sequencing for long-lead equipment, outage windows and key milestones. I can also provide: • Logic-linked Primavera P6 baseline (.xer) • PDF and Excel schedule extracts • Critical-path and float analysis • Engineering/procurement/construction activity sequencing • Schedule QA using DCMA 14-point or equivalent checks • QA findings and corrective recommendations • Clear narrative of assumptions, constraints and float drivers My electrical and infrastructure background allows me to understand the technical dependencies behind substation activities rather than treating the schedule as generic project-management data. I’m available to start immediately and can work closely with your engineering/procurement information to build a practical, transparent baseline ready for management review. Rate: $12/hour | Delivery: 10 days Best regards, Abdulkerim
$12 USD in 40 days
0.0
0.0

Kano, Nigeria
Payment method verified
Member since Jan 8, 2022
$30-250 USD
$10-30 USD
$750-1500 USD
$50-100 USD / hour
$10-60 USD
$30-250 USD
$250-750 USD
$750-1500 USD
$25-50 USD / hour
$30-250 USD
₹250000-500000 INR
$100-150 USD
$750-1500 AUD
$250-750 USD
₹400-750 INR / hour
₹1500000-1800000 INR
£18-36 GBP / hour
$30-250 USD
$10-30 USD
$15-25 USD / hour
₹2000000-2600000 INR
₹12500-37500 INR