
Closed
Posted
# Project: Migrate Microsoft Power Pages Website from Developer Environment to Production ## Project Overview I have built a website using **Microsoft Power Pages** in a **Developer Environment** (sandbox). I need an experienced **Microsoft Power Platform / Power Pages** developer to migrate the solution to the **Default Production Environment**. ## Scope of Work The successful freelancer will help migrate the following components from the Developer Environment to the Production Environment: * Microsoft Power Pages website * Dataverse tables * Cloud Flows (Power Automate workflows) * Any related solution components required for a successful deployment The objective is to package the required components into a solution (if needed) and deploy them correctly to the production environment while ensuring all dependencies are handled. ## Important Requirement Due to my company's security policy: * **Direct access to the environment cannot be provided.** * **Guest access or user account access is not possible.** * The entire task **must be completed via screen sharing** (Microsoft Teams, Zoom, or similar). * You will guide me through the process or remotely assist while I perform the actions during the screen-sharing session. ## Required Experience Please apply only if you have proven experience with: * Microsoft Power Pages * Microsoft Dataverse * Power Platform Solutions * Power Automate (Cloud Flows) * Environment migration and deployment * Managing solution dependencies and production deployments
Project ID: 40611597
167 proposals
Remote project
Active 3 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
167 freelancers are bidding on average $14 USD/hour for this job

Hi, I noticed you want to move your Power Pages site without direct access, which can be tricky. Sometimes the small details like data dependencies trip people up, so I focus on checking everything step-by-step. I will guide you through packaging your website, Dataverse tables, and flows to ensure proper moving. Do you already have a plan for handling dependency issues if they pop up? Let's chat about how we can plan this well and create something great together. Regards, Nick. I have worked on projects like the Multi-vendor Marketplace, Ticketing HIPAA Medical Records, and the Car Fleet Management solutions; they all involved careful deployment and problem-solving similar to your needs.
$8 USD in 3 days
9.3
9.3

Hi, I reviewed your need to migrate a Microsoft Power Pages website from the Developer Environment to the Default Production Environment, including Dataverse tables and Cloud Flows. I’ll focus on packaging the right Power Platform solution components and deploying them to production with dependencies handled so nothing breaks after publishing. I will guide you through the deployment step-by-step during screen sharing, aligning configuration for Power Pages and Dataverse, and ensuring Power Automate workflows deploy correctly. If needed, I’ll also prepare the solution structure for reliable transport. I’ll keep the process clean, responsive, and easy to manage while we validate outcomes together. Let’s discuss here now.
$15 USD in 15 days
8.3
8.3

Migrating a Power Pages solution to production is more than exporting and importing a solution—it requires careful handling of Dataverse dependencies, Cloud Flows, environment variables, and deployment order to ensure everything works seamlessly after go-live. Since your security policy requires the migration to be completed entirely via screen sharing, I'm comfortable guiding you through every step while you perform the actions. I'll help package the correct managed/unmanaged solution, verify dependencies, migrate the Power Pages site, Dataverse tables, and Power Automate flows, then validate the deployment to ensure nothing is missed. As an added safeguard, I'd recommend running the Solution Checker before deployment and validating connection references and environment variables early, as these are common causes of production migration issues. **Why Work with Me** * 12+ years delivering secure web and business application solutions * Top 3% Verified Freelancer with 308+ Five-Star Reviews * Strong experience with Power Platform integrations, Azure, and enterprise deployments * Clear communication and reliable guidance for remote, screen-sharing engagements A couple of questions: * Is your Power Pages site already included in a solution, or will we need to package it first? * Are there any custom connectors or environment variables used by the Cloud Flows that will also need to be migrated? Looking forward to hearing from you. Kind Regards, M Adeel,
$9 USD in 40 days
8.1
8.1

As an experienced Microsoft Power Pages developer with a wealth of knowledge in managing solution dependencies and performing production deployments, I'm confident in my ability to successfully migrate your website from the Developer Environment to the Production Environment. To address your company's security policy, I'm well versed in remote collaboration and will guide you through the entire process via screen sharing (Microsoft Teams, Zoom, etc.), ensuring you're comfortable while we complete the task together. Over the years, my team and I have built numerous AI-powered software systems and intelligent automation workflows using Microsoft Power Platform and Power Automate (Cloud Flows), aligning perfectly with your project requirements. Our strong grasp on Microsoft Dataverse guarantees that your tables will be correctly integrated during the migration process. On top of that, my skills in HTML and Website Design will allow me to seamlessly package the required components into a solution if necessary and ensure their appropriate deployment in the Production Environment. My goal is not only to successfully complete this migration but to also provide value-added insight into making your website even better. Choose me for a smooth, expertly handled migration process.
$8 USD in 40 days
8.1
8.1

Hello, We have experience working with Microsoft Power Platform and can assist you in migrating your Power Pages solution from the Developer Environment to Production while ensuring all dependencies are handled correctly. We can help you: • Migrate your Power Pages website using managed/unmanaged solutions • Deploy Dataverse tables and related components • Migrate Power Automate Cloud Flows • Resolve solution dependencies and deployment issues • Validate the production environment after deployment • Guide you step-by-step during a Microsoft Teams or Zoom screen-sharing session, respecting your security policy We understand the importance of a smooth production deployment and will ensure the migration is completed with minimal disruption. A few questions: Are both environments within the same Microsoft tenant? Are all components already included in a Solution? Are there any custom connectors or plugins involved? Best regards,
$12 USD in 40 days
7.8
7.8

YES------------>>Let's migrate your Power Pages solution from the Developer environment to Production, ensuring all Dataverse tables, Power Automate flows, and dependencies are deployed correctly. Experienced with Power Pages, Dataverse, and solution deployments. I can guide the entire migration securely via screen sharing. Best Regards!!
$10 USD in 40 days
7.4
7.4

Hi! My name is Marjan and I'm here to offer you my services as a skilled applicant with over a decade of experience working on Freelancer.com. l believe I am the best fit candidate for this project due to my extensive experience; I would like to have a discussion to get to know that we both are on the same page. Once the scope will be locked, I will start working on it right away.
$20 USD in 40 days
7.0
7.0

Hello, I can guide your Microsoft Power Pages migration from the Developer Environment to the Default Production Environment entirely through screen sharing. I will help package the Power Pages site, Dataverse tables, Cloud Flows, and related solution components, then validate dependencies and deployment steps as you perform them. A useful improvement is to create a clean managed solution deployment path with a short rollback checklist, so future production updates are safer and repeatable. I’m ready to work within your security policy using Teams or Zoom. Best regards,
$25 USD in 15 days
7.0
7.0

Hello, I've handled Power Pages migrations between environments, including Dataverse, solutions, and flows. Given your no-access policy, I'll guide you via screen sharing, packaging components into managed solutions, resolving dependencies, updating connections, and validating in production. We'll ensure a clean deployment with checks and rollback steps before go-live too. Thanks- Webcast Technology
$10 USD in 1 day
6.7
6.7

Hello I have gone through your specific requirement for Power Pages migration. I would use managed solutions instead of unmanaged because production stays cleaner and future updates are much easier to track. I will guide the whole deployment over Microsoft Teams while you perform each step. And check solution dependencies, Dataverse tables and Cloud Flows before importing, at least that is where I would start. Worked with business clients on Power Platform deployments across multiple environments. Screen recordings and migration notes I can show. Is the website already packaged into a solution? I want to get clear on any environment variables before starting. Free for a quick call this week? Dev S.
$15 USD in 40 days
6.6
6.6

Hi, this is a straightforward Power Pages promotion on the surface, but the real engineering risk is hidden dependency drift between the site, Dataverse objects, cloud flows, and environment-specific bindings during import. I’ve handled production deployments where the work is less about building and more about packaging the right components, validating references, and avoiding partial releases. The screen-sharing constraint is workable if the session is structured and the deployment path is verified before any import into the Default Production Environment. The closest examples in my background are Custom Feature Development & Integration and HubSpot CRM Implementation & Interactive Senior Living Website, both of which involved stepping into existing systems, tracing dependencies, and guiding controlled rollout decisions. I usually structure this as a pre-migration inventory, dependency check, solution packaging review, import sequence, and post-deployment validation pass. For this kind of move, the main tradeoff is speed versus completeness; I prefer validating every dependency up front rather than discovering broken references after import. These are the kinds of systems I design to be supportable after launch, not just moved once. If useful, I can use the first session to map the migration sequence and identify likely dependency or configuration issues before you execute the production steps. Thanks, Hercules
$50 USD in 40 days
6.6
6.6

Hello, I have worked with Microsoft Power Pages migrations where Dataverse tables, Power Automate cloud flows, and solution dependencies need careful handling before production deployment. I can guide the move from your developer environment to the default production environment through screen sharing, without needing direct access. We will review the Power Platform solution, include the Power Pages site, check related Sharepoint or HTML web file dependencies, then import and publish in production. I will stay on the call while you perform each step, validate connections, and test the site after deployment. Best regards, Teo
$20 USD in 34 days
6.2
6.2

I have extensive experience managing Microsoft Power Platform environments and can execute your Power Pages Website Migration from developer to production seamlessly. I am proficient with the Power Platform CLI and the underlying Dataverse architecture required for a clean transition. I will ensure all site settings, custom HTML, and Power Automate flows are properly remapped to work in your production tenant without downtime. My expertise in Azure and SharePoint integration ensures that your site permissions and backend connections remain secure throughout the migration process. I can handle the site visibility settings and domain mapping according to best practices. When would you like to begin the migration?
$12 USD in 40 days
6.3
6.3

As an experienced Full Stack Developer and Digital Solutions Expert, I have over 8 years of experience, including a significant amount with the Microsoft Power Platform and Power Pages. With a track record of successfully delivering over 200 projects, your migration from the Developer to Production environment aligns perfectly with my expertise. Navigating around such security restrictions is not new to me, and I understand that an efficient screen-sharing process is paramount. I'm well-acquainted with tools like Microsoft Teams and Zoom and can guide you through every step or assist remotely as you perform actions during the screen-sharing sessions. In addition to my Power Pages skills, my proficiencies include Azure and HTML which will aid in completing a successful migration of your Dataverse tables, Cloud Flows, and other related solution components. Trust that I can package the required components into a durable solution and deploy them accurately to your production environment while managing potential dependencies gracefully. In conclusion, my extensive background in environment migration and deployment, solution management, and above all else - Microsoft Power Platform makes me the ideal fit for this crucial task. Let's collaborate seamlessly to make your vision for this project come to life.
$15 USD in 40 days
6.4
6.4

Hello, Lyes here: I understand you need a safe, guided migration of a Power Pages site plus Dataverse tables and Cloud Flows from a Developer sandbox into Default Production, and that the work must be done via screen sharing with no direct access. A key challenge is resolving solution dependencies and managed/unmanaged component differences without direct environment access, which can block import if not addressed beforehand. I propose to package the website, tables and flows into a solution, run dependency checks, export as a managed solution where appropriate, and walk you step‑by‑step over Teams/Zoom to import and validate in production, adjusting ownership, connections and environment variables as we go. Are there any managed solutions already in production that the new components depend on? Also, do you have environment variable values or connection references prepared? Looking forward to hearing from you.
$12 USD in 3 days
6.3
6.3

Hi there, Your Power Pages website can be migrated from the developer environment to production, packaging Dataverse tables, cloud flows and related components correctly while guiding you through everything live over screen sharing exactly as your security policy requires. Quick questions before starting: Are the solution components already organised, or should that be reviewed first together? Is Microsoft Teams the preferred platform for the screen sharing session? Should a rough dry run be done first before the actual production deployment? Solution will include reviewing dependencies across the website, tables and flows, guiding the packaging into a solution where needed, walking through each deployment step live while you perform actions on your end, checking for errors after migration and confirming everything runs smoothly in production without direct access needed on my side. Relevant experience includes handling Power Platform environment migrations and solution deployments with careful dependency management. Happy to schedule a screen sharing session and discuss further in chat. Best regards Farhin B
$8 USD in 40 days
6.6
6.6

Hi, I've handled multiple Power Platform deployments where security policies required screen-sharing only, so I'm comfortable guiding the entire migration without direct environment access. I've migrated Power Pages, Dataverse tables, Power Automate cloud flows, and managed/unmanaged solutions, resolving dependency issues, connection references, environment variables, and deployment validation along the way. During our session, we'll package the solution correctly, import it into Production, validate all dependencies, repoint connections where needed, test the website and flows, and ensure everything is working before we finish. You'll also receive clear guidance so future deployments become much easier. The hourly budget is not fair. My rate is $25/hour, and I expect this to take 4–8 hours, depending on solution complexity and any dependency issues. Let's make your production deployment smooth and error-free on the first attempt.
$25 USD in 40 days
6.0
6.0

Hello, We are Microsoft Power Platform (Power Apps & Power BI) Certified professionals with hands-on experience deploying Power Pages, Dataverse, Power Automate, and managed/unmanaged solutions across Development, Test, and Production environments. We understand your security constraints and are comfortable completing the entire migration via Microsoft Teams or Zoom screen sharing. We'll guide you step by step while you perform the actions, ensuring the Power Pages site, Dataverse tables, Cloud Flows, and all dependent solution components are packaged and deployed correctly. We'll also validate dependencies, environment variables, connection references, and perform post-deployment verification to ensure a smooth production rollout. We can schedule the session at your convenience and complete the migration efficiently with minimal downtime. Regards,
$15 USD in 40 days
6.1
6.1

Hi, I can help migrate your Microsoft Power Pages solution from the Developer Environment to Production while ensuring all dependencies and components are properly handled. I have experience with Power Pages, Dataverse, Power Automate flows, solution packaging, and Power Platform deployments. I can guide you through the complete migration process via screen sharing while you perform the required actions. I will help prepare the solution, verify tables, flows, permissions, and deployment settings to ensure the production environment works correctly after migration. I would be happy to schedule a session and review your current setup to plan the safest migration approach. Best Regards, Fizza Nadeem K
$10 USD in 40 days
6.1
6.1

Hi, I’ve worked on web application reviews and QA assessments where the goal was identifying technical, usability, and conversion issues before wider launch. I understand that valuable feedback requires looking at the platform from both a developer perspective and a real customer’s point of view. The main challenge in these evaluations is finding problems that directly impact trust, purchases, and user experience. My approach would be to test the website across desktop and mobile browsers, review navigation, performance, product discovery, account flow, checkout, and usability, then document each issue with reproduction steps, screenshots, severity, and practical recommendations. I’ll provide a detailed evaluation report covering critical blockers, UX improvements, technical issues, and the highest-impact changes needed to improve customer confidence and platform performance. Best Regards, Muhammad Saad K
$12 USD in 40 days
5.7
5.7

Woodbridge, United States
Payment method verified
Member since Dec 5, 2012
$250-750 USD
$15-25 USD / hour
$1500-3000 USD
$8-15 USD / hour
$15-25 USD / hour
$8-15 USD / hour
₹12500-37500 INR
$8-15 USD / hour
$30-250 USD
₹12500-37500 INR
£20-250 GBP
$14-30 NZD
₹12500-37500 INR
₹12500-37500 INR
₹1500-12500 INR
₹600-1500 INR
min $50 AUD / hour
£20-250 GBP
₹600-1500 INR
$250-750 USD
$10-30 USD
$30-250 USD
₹1500-12500 INR
$250-750 USD