Færdiggjort

work on primavera

Tildelt til:

(6 bedømmelser)
3.6

10 freelancere byder i gennemsnit $230 timen for dette job

hany74

Hello, I read the project details and I can do it for you professionally, I have Primavera P6-19, and I have experience in creating, developing, and updating schedule with labor and cost loaded for 10 years. Please, ch Flere

$140 USD in 7 dage
(41 bedømmelser)
5.5
(16 bedømmelser)
4.9
(24 bedømmelser)
4.6
(1 bedømmelse)
3.6
EslamWafdy

Hi I have read your job description and i have tenecesary experience to conduct aproject using Primavera software. I will do the work as best as you it must be produced. Let us discuss the details over chat Hope to f Flere

$115 USD på 1 dag
(0 bedømmelser)
0.0
osamazarzour

Hi! Your job post grabbed my attention instantly as it perfectly matches my skills. I am a Project Planning & Scheduling Expert. PMP Certified Civil Engineer, with 15+ years of experience in Construction Project Mana Flere

$150 USD in 3 dage
(0 bedømmelser)
0.0
Call1116

Hi there, Your job post is exact match for my expertise. I have 6+ years of experience in the construction industry, with focus on project scheduling, planning and Controlling. A Planning Engineer With a MSc degree Flere

$140 USD in 3 dage
(0 bedømmelser)
0.0
ahmedmokhles87

Dear Sir, I am a Team leader planning engineer with ten years of experience in project management. I have worked on many Middle East Egypt & American projects for MTA, VA, OGS, FDOT, NYSDOT and created a baseline with Flere

$1000 USD in 7 dage
(0 bedømmelser)
0.0
Henokend

I am Civil Engineer with more than 15 years experience on design and construction supervision of various size water resources development infrastructures. I have worked as designer, project planner , construction super Flere

$140 USD in 7 dage
(0 bedømmelser)
0.0