Job ikke fundet

Beklager, vi kunne ikke finde jobbet du ledte efter.

Find de seneste jobs her:

Application Developer - News App 6 dage left
VERIFICERET

1. We want to develop a REAL-TIME News App for ANDROID and iOS both. [Ref: in-shorts app ] 2. Candidate should know Backend - Node.js 3. Candidate should know Frontend - Flutter 4. Want someone to deliver within time and given budget.

€930 (Avg Bid)
€930 Gns Bud
35 bud

Punjab Small Industries and export corporation Ltd is developing a new Industrial Park in Ludhiana which is enlisted as the one of the key project of Punjab Govt. Further, all the basic facilities i.e. internal concrete roads, water supply, sewerage system, effluent collection system, electrical trench and storm water drainage system shall be provided to the allottees. Out of total 380 acre land, ...

€14 (Avg Bid)
€14 Gns Bud
7 bud

Automate Amazon sellers reports

€23 / hr (Avg Bid)
€23 / hr Gns Bud
6 bud

I am looking for a maths teacher who has the gift of explaining complex concepts in simple terms (no bids from india pakistan region please) , and does not make simple concepts into torturous processes. These have to be videos where you are writing on paper and talking and recording with a camera as you write and talk. Will pay per topic. First topic is 'rounding an estimating numbers'....

€9 - €26
€9 - €26
0 bud

want someone help me to get VIRTUAL VISA CARD for online shopping

€221 (Avg Bid)
€221 Gns Bud
1 bud
GIALLOUROS.COM 6 dage left

INDUSTRIAL CONSUMABLES FASTENER B2B PORTAL

€26 / hr (Avg Bid)
€26 / hr Gns Bud
19 bud
internal project 6 dage left

Project is to build UI which only includes rendering graphs (high charts in react) and to build a date picker which includes compare and trend functionality

€130 (Avg Bid)
€130 Gns Bud
20 bud
Graphic design 6 dage left

I am a graphic designer I can do anything you want on this area

€258 (Avg Bid)
€258 Gns Bud
24 bud

I am working on a random forest model on R. I have completed the model and when I plot, the frequency of the r-square values has a negative range to positive two range. I am not sure if I am doing something wrong with my r-square formula. the script was attached. line 195-197 is my r-square formula

€18 (Avg Bid)
€18 Gns Bud
2 bud

Need a total design for a new book

€262 (Avg Bid)
€262 Gns Bud
57 bud