I gang

solve a linear programming problem in 2 variables and obtain the solution graphically.

I want this to be solved like in 1 day:

A factory makes 3 components, A, B and C using the same production process for each. A unit of A take 1 hr, a unit of B takes 0.75 hrs and a unit of C takes 0.5 hrs. In addition, C has to be hand finished, an activity taking 0.25 hrs per unit. Each week total production time (excluding hand finishing) must not exceed 300 hrs and hand finishing must not exceed 45 hrs.

The components are finally assembled to make two finished products. One product consists of 1 unit of A and 1 unit of C selling for 30 pounds whilst the other consists of 2 units of B and 1 unit of C and sells for 45 pounds. At most 130 of the first product and 100 of the second product can be sold each week.

3. a. Formulate the problem of planning weekly production to maximise total proceeds as a linear programming problem in 2 variables and obtain the solution graphically.

3. b. Revise the price for the first product from £30 to £35 and resolve the problem graphically to find out and show the new optimum solution. Compare the old and new solutions with respect to the impact of the price.

3. c. Revise the limit for the number of the second product from 100 to 120 and resolve it graphically to find out and show the new optimum solution. Compare the old and new solutions with respect to the impact of the capacity limit.

3. d. Solve the problem with MS Excel Solver in-built functionality for all three cases to verify your solutions found graphically.

Færdigheder: Lineær Programmering, Matematik

Se mere: variables in programming, solution programming, programming variables, programming solution, programming process, programming factory, planning problem, optimum it solutions, number mathematics, linear programming problem, impact products, find the solution to, find the solution for, find the solution, Find mathematics, find factory, factory programming, c++ programming problem, a b, weekly limit, solve problem, production planning, optimum time, mathematics problem, linear

Om arbejdsgiveren:
( 5 bedømmelser ) Luton, United Kingdom

Projekt-ID: #4113011

3 freelancere byder i gennemsnit £30 for dette job

bchandra1955

Thanks for inviting, will be as soon as possible.

£35 GBP på 1 dag
(13 bedømmelser)
4.0
nmlemus

I can do the job, I am proffesor of math at uuniversity and I have experience with those problems. Just tell me if I can use Matlab to solve it ASAP. Regards Noel

£25 GBP på 1 dag
(0 bedømmelser)
0.0
harubel

Expert is here and consider it done professionally.

£30 GBP på 1 dag
(0 bedømmelser)
0.0