Job ikke fundet

Beklager, vi kunne ikke finde jobbet du ledte efter.

Find de seneste jobs her:

I want to make like [log ind for at se URL]

€214 - €641
€214 - €641
0 bud
post a project 6 dage left

I need a responsive website. I would like it designed and built.

€104 (Avg Bid)
€104 Gns Bud
3 bud
Proofread Article (Jul. 2018) 6 dage left
VERIFICERET

Proofreading of a draft article in English for a professional journal. Approximately 17,000 words excluding footnotes (you don’t need to proofread footnotes). In 3–5 days. I prefer a native English (US) proofreader who is familiar with law or social science. Although it's a bit long, I believe my English is not bad. A sample page is attached. Thank you!

€328 (Avg Bid)
€328 Gns Bud
10 bud

I'm looking for someone who is able to create a 3d model caps (see picture) that I will be able to print on my 3d printer (Tevo Tarantula). It's for my old car, for personal use. Need an exact replica high quality. Just the top to create, the back can be flat.

€20 (Avg Bid)
€20 Gns Bud
6 bud

I'm a programmer that is working on an indie title with a style similar to the image attached below. So the task would be creating sprites similar to this one and animating them with the typical animations such as attack, run, idle etc... I'd be looking for about 2 of these sprites in total (for now) and I'd like them to be a knight and a skeleton. We'd work out specifics when ...

€123 (Avg Bid)
€123 Gns Bud
4 bud

Looking for a Magento 2 Front End developer with experience that can customize our theme.

€15 / hr (Avg Bid)
€15 / hr Gns Bud
19 bud

I need you to write some articles. I am Piyush Goyal

€7 - €19
€7 - €19
0 bud
Copywriting services 6 dage left
VERIFICERET

Need to rewrite less than 1500 words, in two-three hours

€119 (Avg Bid)
€119 Gns Bud
21 bud

Intérprete y traductora de portugués a español o español a portugués

€26 (Avg Bid)
€26 Gns Bud
2 bud

Make me a good company website and documents

€40 (Avg Bid)
€40 Gns Bud
16 bud