I gang

Animering Job by nobody1vw

Animated chart. Same style as previous project.

Instructions (copy from the job3.ods-file):

The trendline for Antall fullførte boliger and Befolkningsvekst should start at the same time.

When these two trendlines are half finished, the trendline for BPI should start.

The left Y-axis should have the following scale: 0, 10 000, 20 000, 30 000, 40 000, 50 000, 60 000, 70 000 (this scale is for the Antall fullførte boliger and Befolkningsvekst trendlines)

The right Y-axis should have the following scale: 0, 20, 40, 60, 80, 100, 120, 140, 160, 180 (this scale is for the BPI trendline)

The X-axis should start counting at 1992

All three trendlines should have different colors.

The names of all the three trendlines should stay on the left side, at the same height (same position) that the trendline is starting, and the text should be in the same color.

Data for Antall fullførte boliger in 2012 is missing, so that trendline can simply stop at 2011.

Færdigheder: Animering

Se mere: animated custom, trendlines, axis text, dec 2011, trendline, ods chart, setup project custom, different names project, deployment project custom message, dotproject project custom sort

Om arbejdsgiveren:
( 100 bedømmelser ) Lund, Sweden

Projekt-ID: #4077085

Tildelt til:

eLeopard

Hired by the Employer

$75 USD in 7 dage
(49 bedømmelser)
5.9