
Closed
Posted
Paid on delivery
I need a complete, trade-broken Bill of Quantities for a new custom-build residence in Wembley Downs, Western Australia. You will be working off the full residential construction drawing set that I’ll supply (architectural, structural and services). Specification level: mid–high range, yet using standard materials as noted on the plans. Please include allowances that reflect local WA rates and current market conditions. Scope of measurement • Foundation and Structure • Electrical and Plumbing • Finishes and Landscaping Deliverables 1. An Excel workbook (my required format) with separate, clearly-labelled sheets for each construction stage listed above. 2. Quantities, units, unit rates and extended totals for every item, rolled up into trade subtotals and an overall project total. 3. A concise summary page highlighting provisional sums and any assumptions you needed to make. Acceptance criteria • Quantities trace back unambiguously to the drawing references. • Rates align with reputable Perth cost databases or recent contractor pricing (cite your source). • Excel formulas remain live so I can adjust variables later. Send a short note on your methodology and estimated turnaround time when you submit your proposal. Drawing pack will be available on the 6th May.
Project ID: 40418372
20 proposals
Remote project
Active 5 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
20 freelancers are bidding on average $165 AUD for this job

Hello, I am a design engineer, I am expert in take off of STR, ARCH and MEP designs so i can do the required quantities in the required time. I have finished similar projects before and finished 600+ projects. Please check my portfolio and reviews. Thanks.
$175 AUD in 3 days
8.6
8.6

Hi there! I can deliver a detailed BOQ and cost estimate with itemized materials, labor, quantities, and unit rates—ensuring accurate budgeting, transparent costing, and a contractor-ready document for tendering and execution. Questions ? Do you have drawings/specifications ready for quantity takeoff? ? Do you need only BOQ or full cost estimate including overheads/profit? ? Which standards or rates should I follow (CPWD, local market, or custom)? Don't pay a single penny until you are happy with the job I look forward to your response and thank you for your consideration. Warm regards, The Blend Nation.
$33 AUD in 1 day
7.0
7.0

Hello Sir Drawing upon my expertise as a versatile and adaptable professional, I can confidently undertake the task of creating a thorough Bill of Quantities (BoQ) for your custom-build residence in Wembley Downs. My skills extend beyond just web development and graphic design, encompassing an extensive command over Excel. By providing detailed itemization according to distinct construction stages, incorporating local WA rates, and maintaining the flexibility of live-Excel formulas for future adjustments, I can ensure a precise and useful BoQ for your reference. Over the course of my career, I've consistently demonstrated an aptitude for diligently adhering to project requirements. In this case, I’ll ensure that quantities are meticulously traced back to drawing references while keeping the rates grounded in reputable Perth cost databases or recent contractor pricing – continuously citing my sources. Moreover, my strong grounding in software such as 3D models will provide me with greater contextual understanding of the project drawings optimizing the efficiency and accuracy of my work.
$80 AUD in 1 day
6.6
6.6

As a seasoned professional, I am confident in my ability to provide precise and detailed deliverables for your Detailed BoQ & Cost Estimation project. Having worked extensively in 3D animation and solid works, I understand the importance of accurate measurements and specifications. I assure you that my work will align with your drawing references and be backed by reputable Perth cost databases or recent contractor pricing. My proficiency in software such as AutoCAD, 3DS Max, and Rhino guarantees the creation of clear and easily comprehensible Excel worksheets with formulas functioning correctly. I understand that you need not only a trade broken bill but also an easy-to-change format for future adjustments. I assure you that all the aspects of this project will be meticulously carried out, from include allowances reflecting local WA rates to a concise summary page highlighting provisional sums and assumptions made. With my experience in web designing and development, I believe I can provide a unique perspective to your projects. My familiarity with various software also offers flexibility to adapt to different styles. Overall, my commitment is to deliver quality work within agreed-upon timelines. Thank you for considering me for your project; I look forward to working with you!
$56 AUD in 1 day
5.9
5.9

Hi, This is Maksim. I can prepare a complete, trade-broken Bill of Quantities for your Wembley Downs residence based on your full drawing set, aligned with current Western Australia market rates and mid–high specification standards. My methodology ensures all quantities are measured directly from drawings with clear traceability, supported by reliable local cost data sources and structured with transparent, live Excel formulas. You will receive a well-organized workbook with separate trade sheets, detailed cost breakdowns, and a concise summary of assumptions and provisional sums for easy review and adjustment. Thank you.
$140 AUD in 7 days
5.9
5.9

As a specialist in advanced Excel techniques and VBA automation, I'm uniquely equipped to tackle your detailed Bill of Quantities and Cost Estimate project. Using live Excel formulas, I'll ensure that you have the ability to alter variables as needed going forward. My focus on structured systems and clean data translates well into creating standardized, user-friendly spreadsheets like the one you've described, replete with separate tabs that are clearly labelled for each stage of construction. In terms of your vision, I can adhere precisely. The quantification will not only trace back unambiguously but I will also align the rates meticulously with reputable Perth cost databases or recent contractor pricing— an assurance I give based on diligent research as part of my methodology. With a deep understanding of the value of time in business, I commit to completing this work within your desired timeline. Your drawing pack on 6th May would be promptly analyzed and incorporated into an efficient workflow, allowing me to provide you with high-quality deliverables in record time. Choose me for a project that holds accuracy and reliability at its core!
$200 AUD in 2 days
5.2
5.2

Dear Client, We can prepare a complete trade broken Bill of Quantities for your custom residence in Wembley Downs with clear structure accurate measurement and live Excel formulas. Our team has strong experience in residential takeoffs cost planning and construction documentation. Using your full architectural structural and services drawings we will quantify foundation structure electrical plumbing finishes and landscaping with drawing references for traceability. Unit rates will be aligned with current Perth market data reputable cost sources and suitable mid high range standard materials. You will receive an organized Excel workbook with separate trade sheets subtotals overall project summary provisional sums and assumptions. Our methodology will focus on transparent measurement clear formulas and practical cost review. We are ready to begin once the drawing pack is available on 6 May. THE CALIFORNIA STUDIO
$250 AUD in 2 days
4.5
4.5

Hi, I’m a multidisciplinary engineer focused on design + analysis, delivering production ready CAD and simulation-backed solutions. I work across mechanical and architectural scopes, with clear drawings, practical detailing, and fast communication. Feel free to check my profile for similar projects ,happy to review your scope and suggest the best next steps. G. Zaralı
$200 AUD in 2 days
4.5
4.5

Hi there, I reviewed your job posting and see you need a complete trade-broken Bill of Quantities for a custom residential build in Wembley Downs, WA. I’ve prepared BOQs for similar mid–high residential projects and can deliver an accurate, construction-ready Excel workbook based directly on your drawings. ✅ Foundation & structure, MEP, finishes & landscaping measured in detail ✅ Trade-broken BOQ with quantities, unit rates, and extended totals ✅ WA market-aligned pricing using recent Perth contractor benchmarks ✅ Excel with live formulas for easy adjustment ✅ Summary sheet with assumptions & provisional sums Methodology: quantities will be extracted directly from architectural, structural and services drawings and cross-checked against current WA cost databases and recent Perth supplier/contractor rates. Turnaround: 3–5 working days after receiving full drawing set. Portfolio samples: https://www.freelancer.com/u/ranaabubakar1993 Can we discuss scope once the drawing pack is ready? Best regards,
$140 AUD in 3 days
4.2
4.2

Hello, With a background in structural design and civil engineering, I am well-versed in analyzing construction drawings and generating accurate Bill of Quantities (BoQ) catered towards standard local materials and market conditions, which aligns with your project specifications. My 7+ years in the building construction industry have honed my ability to ensure the quantities trace back unambiguously to the drawing references as well as link rates to reputable Perth cost databases or recent contractor pricing, citing sources for transparency. Alongside my technical proficiency, I'm also highly skilled in AutoCAD and REVIT, which will facilitate my creation of your detailed BoQ in your desired Excel format. The Excel workbook will have separate, clearly-labelled sheets for each construction trade listed in the project description as well as a concise summary page that highlights provisional sums and assumptions made. Additionally, I will ensure that all formulas remain live so you have full flexibility to adjust variables later on. In terms of turnaround time, I am confident in completing the task efficiently and effectively. My methodology involves meticulous attention to detail combined with comprehensive understanding of the specific requirements. With a commitment to quality and exceeding client expectations, I strive to turn over projects promptly without compromising on accuracy. I genuinely believe my skills, experience, and d Thanks!
$155 AUD in 6 days
2.8
2.8

Hi there, I deliver trade-broken Bills of Quantities that are fully traceable, rate-justified, and ready for tender submission. Using your architectural, structural, and services drawings, I’ll measure all works across foundations/structure, electrical/plumbing, finishes, and landscaping—tagging each quantity back to drawing references for audit clarity. Rates will reflect current Western Australia market conditions, benchmarked against Perth cost databases and recent contractor pricing, with mid–high spec allowances aligned to your plans. Every item will include quantities, units, unit rates, and extended totals, rolled up into trade subtotals and a clean overall project total. You’ll receive a structured Excel workbook in your format with separate sheets per stage, live formulas for easy adjustments, and a concise summary page highlighting provisional sums, exclusions, and key assumptions. My methodology combines detailed takeoffs (by trade and element), rate build-ups with supplier/labour inputs, and cross-checks against comparable WA projects to ensure accuracy. Turnaround for the first full BOQ is 6–7 days from receiving the drawing pack, followed by one revision round to fine-tune any scope or rate changes.
$30 AUD in 1 day
2.9
2.9

I will prepare a detailed BOQ Only with trade-wise breakdown including structure, MEP, and finishes. Accurate quantity takeoff from drawings Excel with dynamic formulas and clear summaries Inclusion of assumptions and provisional sums Estimated delivery: 3 days after receiving drawings as per your Excel template/ I ensure clarity, accuracy, and professional presentation suitable for contractor-level use. Note : For the cost Estimation Rates you have to Provide..
$190 AUD in 3 days
2.6
2.6

I'm a licensed professional electrical engineer with 6+ years of experience in technical documentation, cost estimation, and detailed quantity take-offs, and I will develop a complete, trade-broken Bill of Quantities for your Wembley Downs custom-build residence with accurate measurements, local WA rates, and comprehensive Excel documentation ready for contractor tendering. I have strong expertise in technical drawing interpretation, detailed quantity take-offs from architectural and engineering plans, cost estimation with material and labor breakdowns, Excel-based documentation with formulas and summary totals, and project cost analysis across construction trades. I will develop a complete Excel workbook with separate trade-broken sheets for Foundation and Structure (footings, slabs, framing, roofing, structural elements), Electrical and Plumbing (power distribution, lighting, outlets, water supply, drainage, fixtures), and Finishes and Landscaping (internal finishes, flooring, painting, external works, landscaping). Each sheet will contain detailed line items with quantities. My methodology includes systematic drawing review identifying all measurable elements, trade-by-trade quantity take-offs with cross-referencing to drawing sheets, local WA market rate research through Perth cost databases. I can start immediately once the drawing pack is available on 6th May and will deliver the complete BOQ quickly. Best Regards, Tahir Saleem
$170 AUD in 1 day
2.0
2.0

Hi, Can you provide some details about the specific materials and finishes you want to incorporate in the project? Understanding your preferences will help me prepare a more accurate Bill of Quantities. I will create a detailed Excel workbook with clearly labelled sheets for each construction stage, including Foundation, Structure, Electrical, Plumbing, Finishes, and Landscaping. The quantities will be traced back to the provided drawing references, and I’ll use reputable Perth cost databases to source unit rates for a mid-high range specification. My plan is to have the initial draft ready within a week of receiving the drawing pack on May 6. I ensure that Excel formulas remain live, allowing you to adjust variables as needed. With my experience in construction estimation and a strong background in Excel, I’m confident I can deliver your requirements. Best Regards, Atik Murtaza
$120 AUD in 2 days
0.0
0.0

Perth, Australia
Member since Apr 9, 2025
$30-250 AUD
$250-750 USD
₹1500-12500 INR
$250-750 USD
£3000-5000 GBP
$250-750 USD
$250-750 USD
$30-250 USD
$250-750 USD
$250-750 USD
$2-30 USD / hour
$30-250 USD
₹500000-1000000 INR
₹750-1250 INR / hour
€8-30 EUR
£20000-50000 GBP
₹750-1250 INR / hour
$10-30 USD
$10-30 CAD
$30-250 USD
₹37500-75000 INR