
Closed
Posted
Paid on delivery
I am assembling a full cost proposal for a new power-distribution substation in Saudi Arabia and need a detailed, line-item quotation that covers every aspect of the civil scope. This includes––but is not limited to––foundation construction, structural-steel erection, complete site grading and excavation, concrete foundations for all equipment plinths, construction of the control/service building, broad site preparation, internal asphalt roads, and any other related civil works you normally allow for on similar utility projects. Your submission should clearly show: • Itemised quantities and unit rates (Excel preferred, PDF acceptable). • Lump-sum elements called out separately where a unit rate is impractical. • Brief notes on assumed construction methodology or standards you are pricing against so I can reconcile them with local SEC requirements. • High-level schedule or durations per major activity to help me gauge manpower loading. If you already have a typical Bill of Quantities template for substation works, feel free to adapt it; otherwise start from scratch but ensure no key work fronts are missing. Only bidders with demonstrable experience pricing or delivering substation civil packages in the GCC will be considered. Please attach one comparable BOQ or final account you have produced (confidential values may be redacted).
Project ID: 40224858
1 proposal
Active 3 days ago
Location: Saudi Arabia
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
1 freelancer is bidding on average $100 USD for this job

Hello there I can prepare a comprehensive, line-item civil cost proposal for your power-distribution substation project in Saudi Arabia. With experience in utility and infrastructure packages, I understand the level of detail required to align with SEC standards and GCC construction practices. The submission will include a structured BOQ covering: -Site grading, excavation, and backfilling -Equipment foundations and plinths -Structural steel erection -Control/service building construction -Internal asphalt roads and paving Underground services, drainage, and ancillary civil works Deliverables: -Itemized quantities with unit rates (Excel format) -Clearly separated lump-sum items -Notes on construction methodology and assumed standards -High-level activity schedule with durations I will ensure no major work fronts are omitted and can adapt a standard substation BOQ template if required. A comparable redacted BOQ sample can be shared upon request. I look forward to supporting your submission. Best regards, Mohand
$100 USD in 2 days
5.3
5.3

Riyadh, Saudi Arabia
Payment method verified
Member since May 9, 2023
$250-750 USD
$30-250 USD
$10-30 USD
$10-30 USD
$250-750 USD
$250-750 USD
₹1500-12500 INR
$300-10000 USD
$250-750 USD
$15-25 USD / hour
$30-250 USD
$250-750 USD
$750-1500 USD
₹12500-37500 INR
€750-1500 EUR
₹1500-12500 INR
$250-750 CAD
$15-25 USD / hour
$25-50 USD / hour
₹12500-37500 INR
$8-15 USD / hour
min €36 EUR / hour
₹100-400 INR / hour
$250-750 USD
₹1500-12500 INR