Construction Scheduling

I need a construction schedule for a class I'm teaching. I do have a network schedule of abstract activities. I would like a "real world" example. A single-family home, garage, etc. something small where I could take the students the forward pass, backward pass, free float, total float, and lag time. If you do not know what these are, please do not bid. If you do know what these are, and have a layout of the schedule, please let me know the number of activities and total duration.

Evner: Civil Ingeniørarbejde, Bygnings Overvågning, Ingeniør Videnskabs Tegning

Se mere: construction schedule template, construction scheduling software, construction project schedule example, residential construction schedule, construction scheduling software free, construction scheduling pdf, different types of construction schedules, building construction schedule activities, professional layout bid, layout bid purposal, gnuplot bid time series, magazine layout bid, website layout bid, number friendster layout generator, need construction page, construction scheduling joomla, please let know bid, family magazine design layout, newspaper layout bid, civil construction scheduling tasks

Om arbejdsgiveren:
( 102 bedømmelser ) Brookline, United States

Projekt ID: #17448541

Tildelt til:

dionisiotumbaga

Hi, I am interested. I have a baseline MS Project Schedule of a "Small House Renovation Project" with 60 activities and 55 days duration. Construction was started in May and completed in June. I would say it will be an Flere

$60 USD på 1 dag
(1 bedømmelse)
2.5

12 freelancere byder i gennemsnit $139 på dette job

$155 USD in 3 dage
(52 bedømmelser)
5.3
$155 USD in 3 dage
(19 bedømmelser)
4.9
jacobbe

Dear Sir/Madam, Good day We are a team of professional civil engineers & Highly Professional in Architectural Design, Fit-out joinery drawings, Structural Design, Rebar/Steel Detailing BIM Modeling, Interior/Exte Flere

$250 USD in 3 dage
(3 bedømmelser)
3.4
hany74

Hello, I'm a mechanical engineer with project management background, utilizing Primavera P3, P6 and MS Project. I have more than ten years of experience in planning and scheduling projects, follow-ups, and analysis i Flere

$155 USD in 3 dage
(5 bedømmelser)
3.2
karimankamal47

hi i can help you i m very clever in this field ----------------------------------------------------------------------------------------------

$100 USD in 3 dage
(3 bedømmelser)
1.6
rOrOeg

Please check my portfolio and Profile , I'm in this field for more than 20 years ,The sample project you want in Primavera or MS Project ?? I have one Project Sample of 62 activities and 68 days Duration Please messag Flere

$50 USD på 1 dag
(0 bedømmelser)
0.0
joeargenio7688

I can make a schedule in Microsoft Project. I will give you an example straight from my Construction Management Textbook from College.

$277 USD in 3 dage
(0 bedømmelser)
0.0
nevenjuranic

Hi I am civil engineer who works on scheduling and consulting. At this time, I am working on Bechtel-Enka's project of 61km motorway dynamic plans and consulting. Also, I have examples of scheduling family houses as h Flere

$155 USD in 3 dage
(0 bedømmelser)
0.0
MAAVI006

Hi sir, im Architectural Engineer. i can done your work with your satisfaction. I can Design Single Family home, according to requirements, with comfortable place for your students. with construction scheduling. I h Flere

$200 USD in 2 dage
(0 bedømmelser)
0.0
CPlanner

Hello, As I understood you need a small scale project for teaching purposes. I've been working as a construction planner for about 5yrs. I can provide the technical support you may need. I've already a 118 activit Flere

$45 USD in 2 dage
(0 bedømmelser)
0.0
hazemmostafa1994

I am a structural civil engineer expert in design of concrete and steel structures , accomplished construction management and construction planning courses certified from columbia university , I can provide you a simpl Flere

$66 USD på 1 dag
(0 bedømmelser)
1.2