I gang

heat storage

Project details are that Steel pipes are embedded in concrete structure. Hot fluid at high temperature is flowing from one end in pipes and coming from the other end with low temperature. Heat is stored by the concrete structure. We have to calculate the how much energy is stored in concrete with time.

Færdigheder: CAD / CAM, Begrænset Element Analyse

Se mere: how to cad, concrete structure, temperature, steel structure, pipes, heat, fluid analysis, energy storage, concrete, structure steel, CAD DETAILS, steel project, project temperature, cam hot, cam hot cam, project cad, embedded cad, finite element project, project cad cam, hot cam, end coming, maya high poly model texture low poly model, java project budget calculate, captcha entry project high payout, cad cam project

Om arbejdsgiveren:
( 1 bedømmelse ) India, India

Projekt-ID: #964928

Tildelt til:

engineer4321

we can doit

$100 USD in 5 dage
(1 bedømmelse)
2.0

12 freelancers are bidding on average $128 for this job

acortigiano

Hi! MSc MEng, please check your PMB. Regards!

$200 USD in 5 dage
(8 bedømmelser)
4.4
bojan1979

Hello, I can do the job, please see PMB,

$30 USD in 2 dage
(1 bedømmelse)
2.0
mjovano

Heat exchanger, knowing problem, I am prepare for this problem.

$150 USD in 5 dage
(0 bedømmelser)
0.0
mahershehab

fea specialist

$90 USD in 4 dage
(0 bedømmelser)
0.0
robertmogor

Please check your PM

$80 USD in 3 dage
(0 bedømmelser)
0.0
Abhishekbaid1

i'm doing my mechanical engineering and well versed with 3d modelling and analysis.

$100 USD in 10 dage
(0 bedømmelser)
0.0
mariusyet

Hello Sir, I really can help you.

$200 USD in 10 dage
(0 bedømmelser)
0.0
desperado9

I can do CFD analysis with modelling in GAMBIT and analysis in FLUENT.

$250 USD in 20 dage
(0 bedømmelser)
0.0
Marias89

For the 3 days that we have bid , our split up of work will be as follows 1st day-> Design 2nd day-> Meshing / Nodal analysis 3rd day-> Calculation of energy ( Iteration process )

$150 USD in 3 dage
(0 bedømmelser)
0.0
varunn86

Project details are that Steel pipes are embedded in concrete structure. Hot fluid at high temperature is flowing from one end in pipes and coming from the other end with low temperature. Heat is stored by the concrete Mere

$31 USD in 2 dage
(0 bedømmelser)
0.0
giridharibehera

i can write a script for this calculation.

$150 USD in 2 dage
(0 bedømmelser)
0.0