I gang

BCV Asset Management- The Blue Chip Report (January 2012)

See instructions- I have loaded all of the files this time!

I have proposed a price of $80- that breaks down to $40 for recreating the document and $40 for updating the content. I propose to use a price of $40 for updating the content in the future.

Færdigheder: Adobe InDesign

Se mere: Chip, chip a, asset, Asset management , asset management document, bcvam, January, project report asset management tracking, asset management website design, newton asset management tokyo, asset management templates, asset management vbnet, head operations deutsche asset management, asset management system logo banners, visual basic script asset management inventory, otc productions digital asset management, access asset management database

Om arbejdsgiveren:
( 37 bedømmelser ) Winnipeg, Canada

Projekt-ID: #4109494

Tildelt til:

mkdoluweera

Hired by the Employer

$80 USD in 2 dage
(71 bedømmelser)
5.5