
In Progress
Posted
Paid on delivery
Cavisa Oil Lda is upgrading its Seahawk cementing unit so every sack pumped, part replaced, and pressure test performed is captured automatically instead of on paper. What I need is a combined data-management and inventory-tracking system that plugs into the unit’s existing sensors and PLC signals, stores the raw readings securely, and turns them into useful information on a live dashboard. The dashboard should refresh in real time, giving operations staff instant visibility of: • Daily operation logs (volumes, rates, pressures, temperatures) • Cement-usage reports (blend, density, total sacks, leftovers) • Equipment-replacement records (part number, reason for change, time stamp) I expect clean database architecture, user-friendly web or tablet interface, and straightforward export to Excel/PDF for our engineers and for TotalEnergies’ end-of-job documentation. If the solution can interface with a barcode or RFID reader for inventory counting, even better. Acceptance criteria 1. Hardware data streamed and stored with no manual re-keying. 2. Dashboard values match field gauges within an agreed tolerance during a live test. 3. One-click generation of a consolidated report covering a full job. 4. Replacement parts automatically deducted from stock and flagged when reorder level is hit. Feel free to suggest the tech stack—SQL Server, PostgreSQL, Node.js, Python, .NET, or anything you’re comfortable deploying in an Angolan field environment with intermittent connectivity. Provide a brief outline of the architecture and estimated timeline with your proposal so I can align it with our next cementing campaign.
Project ID: 40790829
149 proposals
Remote project
Active 6 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
149 freelancers are bidding on average $2,198 USD for this job

For a cementing unit in the field, the system is only trusted if three things hold: readings are never lost when the connection drops, the dashboard matches the gauges the crew already reads, and the job report can be produced in one click for the end-of-job documentation. I would design around those three. How I would build it: 1. Edge collector on a small computer at the unit: reads the PLC and sensor signals (Modbus, OPC UA or the protocol your PLC exposes), timestamps every reading, and stores it locally first, then syncs to the server when connectivity returns, so nothing is lost offline. 2. Database: PostgreSQL (or SQL Server if you prefer) holding raw readings, daily operation logs (volumes, rates, pressures, temperatures), cement blends and sack counts, and equipment replacement records with part number, reason and time stamp. 3. Live dashboard for web and tablet, refreshing in real time, with a calibration screen so values can be compared with field gauges within the tolerance you agree. 4. Inventory: replacement parts deducted automatically, reorder alerts, optional barcode or RFID reader input. 5. One-click consolidated job report in Excel and PDF, and a simulator of the unit's signals so everything is tested before the next cementing campaign; commissioning on site is done with your technician following my written steps. My rating on Freelancer is 4.98 from 51 reviews, and I am the single senior point of contact for the whole project. I can share concrete examples in the Freelancer chat. Price: 2,400 USD, 45 days. The first milestone (25%) covers the data model, the edge collector and the simulator. Question: which PLC model and protocol does the unit use, and can you share its signal list?
$2,400 USD in 45 days
8.5
8.5

Hello, Building scalable dashboards, ERP/CRM systems, and automation solutions for over 15 years makes me well suited to digitize Cavisa Oil’s cementing operations. My experience with Laravel/PHP, Node.js, Python, React, REST APIs, PostgreSQL/MySQL, and cloud deployment supports a secure system that can receive equipment signals, store raw operational data, manage inventory, and present live job information through a practical web or tablet interface. I can develop the platform around a database-backed operations dashboard covering volumes, rates, pressures, temperatures, cement blends, density, sacks, leftovers, and replacement-part history. My ERP/CRM and third-party integration experience is directly relevant to stock deductions, reorder alerts, barcode/RFID connectivity, and consolidated Excel/PDF reporting. C# programming also gives me flexibility when integration with existing PLC or industrial software requires a .NET component. A suitable architecture would use a local data-collection service for intermittent field connectivity, secure synchronization to PostgreSQL or MySQL, and a responsive React/Node.js or Laravel interface with role-based access and reporting. I would estimate approximately 8-12 weeks for a complete first release, depending on PLC protocols and hardware integration scope. I am ready to build a reliable, maintainable solution for your next cementing campaign. Thanks!
$1,600 USD in 12 days
8.6
8.6

For a cementing unit with intermittent connectivity, the key is to capture PLC readings locally before sending them anywhere else. I’d use an on-site gateway to timestamp and buffer sensor data, then feed a live dashboard and sync securely when connectivity allows. That prevents gaps in the job record if the network drops. I’d connect through the PLC’s supported protocol, such as OPC UA or Modbus TCP, and store raw readings separately from calculated volumes, rates and cement usage in PostgreSQL. A web/tablet dashboard would show live values and job history; a report service would generate consolidated Excel and PDF end-of-job documents. Replacement entries would update stock through an auditable inventory ledger, with reorder alerts and an option to accept barcode or RFID scans. During commissioning, I’d compare displayed readings with field gauges against an agreed tolerance and check timestamp alignment, since even accurate sensors can produce misleading reports if their clocks drift. Which PLC model and communications protocol does the Seahawk unit currently expose? With that confirmed, I can map the signals and define the live-test procedure.
$1,600 USD in 35 days
8.2
8.2

⭐⭐⭐⭐⭐ Real‑time Cementing Data & Inventory System for Seahawk Unit ❇️ Hi My Friend, I hope you are doing well. I checked all of your project requirements and I can see you are looking for a combined data‑management and inventory‑tracking system. You have no need to look any further as Zohaib is here to help you! My team is already doing 50+ similar projects for industrial sensor integration. I will build a secure database that pulls PLC data live, and a web dashboard that shows logs, cement reports and part changes in real time. I will also add one‑click Excel/PDF export and optional RFID/barcode support within the same budget. ➡️ Why Me? I can easily do your system as I have 5 years of experience in SQL Server, PostgreSQL, Node.js, Python, .NET, PLC integration, real‑time dashboards. Not only this, I have a strong grip on REST APIs, offline sync and data visualization. ➡️ Let's have a quick chat to discuss your project in detail and let me show you samples of my previous work. Looking forward to discussing with you in chat. ➡️ Skills & Experience: ✅ SQL Server ✅ PostgreSQL ✅ Node.js ✅ Python ✅ .NET ✅ PLC Integration ✅ Real‑time Dashboard ✅ RFID Integration ✅ Excel Export ✅ PDF Generation ✅ Data Security ✅ Offline Sync Waiting for your response! Best Regards, Zohaib
$1,800 USD in 2 days
8.0
8.0

Hello, SE AHAWK CEMENTING UNIT {{{ I CAN CONNECT PLC DATA, LIVE MONITORING, AND INVENTORY TRACKING }}}} I have 12 years of experience in the IT domain and have worked on similar data-management, dashboard, and workflow automation solutions. I’ll build a reliable system that captures PLC/sensor readings automatically, stores raw data securely, and displays real-time volumes, rates, pressures, temperatures, cement blends, density, sack usage, and equipment replacements. My proposed architecture uses a Python or Node.js data-ingestion service, PostgreSQL database, and responsive web dashboard, with a local edge gateway to buffer readings during intermittent connectivity and synchronise them when the connection returns. The system will also track spare parts, integrate barcode/RFID scanning where supported, trigger low-stock alerts, and generate consolidated Excel/PDF job reports for engineering and TotalEnergies documentation. I’ll validate readings against field gauges within an agreed tolerance and test the complete workflow before deployment. Thanks, Christina
$1,500 USD in 13 days
7.6
7.6

Hi, getting the Seahawk unit's PLC readings straight into a database means no more re-keying sack counts and pressures after each job. And since the field link drops, the system has to run on the unit itself, not in the cloud. My outline: a small rugged PC on the unit runs a .NET service that reads the PLC over Modbus or OPC UA. Every reading saves to a local PostgreSQL database first. The web dashboard runs from that same PC, so tablets on site see live values over Wi-Fi with no internet. When the line is back, data syncs to your office copy. Replacement parts come off stock with a reorder flag, and a barcode scanner handles counting. I've done this kind of device work before. I built a clinical app that streams live readings from a USB probe and reconnects on its own when the cable is pulled. I tested it against a device simulator, so work never waited on hardware. I'd do the same with a PLC simulator, then check values against your field gauges in the live test. I have 149 reviews on Freelancer for work like this. You'll have live PLC data and a first dashboard within 1 week. The full system with the one-click job report, Excel and PDF export and inventory takes about 4 weeks, in 3 milestones. If the campaign needs a different order, message me and I'll move things around. I've assumed I'll get the PLC's register map and remote access for testing. Which PLC model is on the Seahawk unit? Haleem
$1,500 USD in 28 days
7.3
7.3

I can develop a reliable, offline-capable cementing data and inventory management system using a PLC/industrial data gateway, Python or Node.js, PostgreSQL, and a real-time web dashboard. The solution will capture and securely store raw sensor readings, provide live operational and cement-usage reports, track equipment replacements, automatically deduct spare parts from inventory, and generate consolidated Excel/PDF job reports. I’ll also assess barcode/RFID integration and implement data buffering and synchronization for intermittent connectivity in the Angolan field environment. Estimated timeline: 6–10 weeks, depending on PLC protocols, sensor access, and on-site testing requirements, with live gauge validation and end-to-end acceptance testing included.
$2,250 USD in 7 days
7.0
7.0

Hello, You need the Seahawk cementing unit's sensor/PLC data captured automatically, stored securely and shown on a live dashboard — plus inventory tracking for cement and replacement parts, and one-click job reports for your engineers and TotalEnergies — all working in an Angolan field environment with intermittent connectivity. Proposed architecture: 1. Edge layer (on the unit): a small industrial PC/gateway running a Node.js or Python collector that reads PLC tags via the PLC's protocol (Modbus TCP/RTU or OPC UA), timestamps readings and buffers them locally (offline-first). 2. Local database: PostgreSQL (with TimescaleDB for time-series) on the edge device, so logging continues without internet; automatic sync to a central/cloud server when connectivity returns. 3. Live dashboard: web/tablet interface (React + WebSockets) showing rates, pressures, temperatures, volumes and density in real time, with job start/stop. 4. Cement usage: blend, density, total sacks and leftovers per job, calculated from sensor data plus operator inputs. 5. Inventory & parts: stock items, part numbers, replacement records (reason, timestamp, technician), automatic stock deduction and reorder-level alerts; barcode/RFID reader support (most readers act as keyboard/USB input, which is simple to integrate). 6. Reports: one-click consolidated job report to PDF and Excel export. 7. Security & roles: user logins, audit trail, backups. Timeline (~40 days): Week 1 requirements + PLC tag map → Weeks 2–3 collector, DB and sync → Weeks 4–5 dashboard, inventory and reports → Week 6 integration test, live calibration check against field gauges, documentation. Important dependencies: I'll need the PLC make/model, tag list and protocol access; the live gauge-matching test needs someone on site (I can run it remotely with your technician). Hardware (gateway/tablet/readers) is purchased on your side — I'll specify it. Question: what PLC make/model is on the Seahawk unit, and does it already expose Modbus or OPC UA? Best regards, Junaid
$2,000 USD in 40 days
7.1
7.1

Hi, For Cavisa Oil Lda's Seahawk cementing unit upgrade, I propose a comprehensive data-management and inventory-tracking system. This system will integrate seamlessly with the unit’s existing sensors and PLC signals, ensuring automatic data capture and secure storage. The system will feature a real-time dashboard for instant visibility of operations. Key Features: - Daily Operation Logs: Volumes, rates, pressures, temperatures - Cement-Usage Reports: Blend, density, total sacks, leftovers - Equipment-Replacement Records: Part number, reason for change, timestamp - Real-Time Dashboard: Live updates for operations staff - Excel/PDF Export: For easy access by engineers and TotalEnergies - Barcode/RFID Integration: For inventory counting Tech Stack: - Database: PostgreSQL for robust and secure data storage - Backend: Node.js for real-time data processing and integration - Frontend: React for a user-friendly web and tablet interface - Reporting: Python scripts for generating consolidated reports Architecture Outline: - Sensors and PLC signals will stream data to a PostgreSQL database. - Node.js backend will handle real-time data processing and dashboard updates. - React frontend will display live data on a responsive dashboard. - Python scripts will generate consolidated reports and manage inventory. Timeline: - Month 1: Requirement gathering and system design - Month 2-3: Development and integration - Month 4: Testing and deployment - Month 5: Training and support This solution will meet all the acceptance criteria, ensuring accurate data capture and real-time visibility. Please review the attached portfolio for more details: https://www.freelancer.com/u/reedsystems Looking forward to your feedback. Best regards, Reed
$2,300 USD in 25 days
6.7
6.7

Hi, We can build the software side of this: a service that receives the cementing unit data, stores it as it arrives, and shows it on a live dashboard that matches the field gauges. Job reports can then be generated with one click. Field connections often drop, so we'd plan for local buffering on site, with sync once the link is back. That way every reading is kept and nothing has to be re-keyed. Which PLC or sensor protocols does the Seahawk unit expose? That decides how we connect the data. WhmDesign LLC
$1,900 USD in 14 days
6.7
6.7

Hey, the detail I’d design around is intermittent connectivity. For a cementing unit in the field, the system can’t depend on the internet during a job. So I’d run everything on a rugged industrial PC mounted on the unit. It reads the PLC, stores the data locally, and serves the dashboard to tablets over local Wi-Fi. When a connection is available, it syncs to your office server, and nothing is lost when the link drops. Architecture: a Python collector reads the PLC over its protocol (Modbus, EtherNet/IP or OPC UA), strictly read-only, so the software can never change anything on the unit. Readings go into PostgreSQL with TimescaleDB, which feeds a live dashboard for logs, cement usage and parts. A barcode scanner on the tablet handles part changes, deducts stock automatically and flags reorder levels. One button produces the full job report in Excel and PDF, in the format TotalEnergies expects. Timeline: about 6 to 8 weeks, then a live test where we calibrate the dashboard against the field gauges until it’s within tolerance. Which PLC make and model is on the Seahawk unit? Juan Pablo
$1,500 USD in 7 days
6.5
6.5

I can help you build the data-management and inventory-tracking system for Cavisa Oil's Seahawk cementing unit to automate data capture and replace paper logs. My approach is to use Python for backend data processing and API integration to capture PLC signals and sensor readings securely. I will use PostgreSQL for clean database architecture to store raw metrics reliably, especially given intermittent connectivity. For the frontend, I will build a user-friendly web and tablet dashboard using React that refreshes in real time to display daily operation logs, cement-usage reports, and equipment replacements. The system will also support barcode or RFID reader integration for inventory counting, automatically deducting used parts and flagging low stock. Finally, I will implement a one-click export feature for Excel and PDF to streamline end-of-job documentation for TotalEnergies. I am ready to deliver a robust solution meeting all your acceptance criteria, including live gauge verification, automated inventory tracking, and complete job reporting. Let us discuss the architecture and timeline to align with your upcoming cementing campaign.
$2,250 USD in 7 days
6.0
6.0

Writing Hello, I can develop a reliable, PLC-integrated data management and inventory tracking system for Cavisa Oil Lda’s Seahawk cementing unit, eliminating manual data entry and paper-based records. My proposed solution includes real-time PLC/sensor data acquisition, secure SQL database storage, offline buffering for intermittent connectivity, and a responsive web dashboard displaying pressures, temperatures, flow rates, volumes, cement consumption, and equipment replacements. I can implement automated stock deductions, barcode/RFID integration, low-stock alerts, and one-click Excel/PDF end-of-job reports suitable for engineering review and TotalEnergies documentation. **Proposed stack:** Python/.NET backend, PostgreSQL or SQL Server, and React dashboard, selected according to PLC compatibility and deployment requirements. **Estimated timeline:** 6–7 weeks, including integration, dashboard development, reporting, testing, and handover. I will validate PLC protocols, sensor accuracy against field gauges, data integrity, offline recovery, and inventory transactions before acceptance. To get started, I would confirm the PLC model, communication protocol, available sensor tags, and existing inventory workflow. I can deliver a maintainable, secure solution designed for reliable operation in Angola’s field environment. Regards. Praggya
$1,500 USD in 16 days
6.7
6.7

Capturing real-time data from the Seahawk cementing unit and turning it into accurate, up-to-date info on a live dashboard is straightforward with the right system architecture. I’d build a backend service to stream sensor and PLC data into a secure SQL or PostgreSQL database, designed for intermittent connectivity with local caching and sync. The front end will be a responsive web app optimized for tablets, showing real-time logs, cement usage, and replacement history with export options for Excel/PDF. Barcode or RFID integration can be added via a middleware layer that updates inventory automatically. To ensure data accuracy, we’ll calibrate dashboard values against live gauges during testing, with alerts for stock reorders based on thresholds you define. The replacement parts workflow will deduct from inventory in real time without manual updates. Do your sensors use standard communication protocols (e.g., Modbus, OPC) for easy integration? Also, will the unit have any network constraints I should consider for data sync? I can provide a draft system design and a 6-8 week timeline covering setup, testing, and deployment to fit your next cementing campaign. Ready to start mapping this out whenever you are.
$1,500 USD in 7 days
5.9
5.9

Hello. "REAL-TIME CEMENT OPERATIONS AND INVENTORY TRACKING" — capture cementing data and equipment changes automatically, replace paper logs with live visibility, and generate accurate end-of-job reports. I’d recommend a .NET backend with SQL Server or PostgreSQL, a responsive tablet dashboard, and a hardware integration layer matched to the existing PLC and sensor protocols. The system would store timestamped raw readings, display live operational metrics, track cement usage and replacement parts, and generate consolidated Excel/PDF reports. For intermittent connectivity, I’d include local buffering and reliable synchronization when the connection returns. I’d begin by validating the PLC interfaces, signal formats, and gauge tolerances, then build and test the data pipeline before implementing reporting and inventory deductions. A realistic timeline depends on hardware access and the available protocol documentation. Can you share the PLC model, communication protocol, and whether a gateway computer is already available on the cementing unit? I’d define milestone acceptance checks around data accuracy, report generation, stock updates, and field testing before deployment.
$2,000 USD in 15 days
6.0
6.0

The key to this system is capturing PLC and sensor readings directly at the source, preserving the raw data, and connecting every cementing operation to accurate usage reports and inventory movements. That gives your operations team traceable records without relying on manual data entry. I’d propose an edge-to-dashboard architecture using a local data gateway to collect available PLC signals through the appropriate industrial protocol, such as OPC UA or Modbus. The gateway would buffer readings during connectivity interruptions and synchronize them with a PostgreSQL database when the connection returns. A responsive web dashboard would display live pressures, temperatures, rates, and volumes, while job-based records would track cement blends, sack consumption, leftovers, and equipment replacements. Barcode or RFID integration could update stock automatically, trigger reorder alerts, and support consolidated Excel/PDF reports for end-of-job documentation. I’d validate sensor mappings and readings against field gauges during commissioning, then test synchronization, inventory transactions, reporting, and recovery from network interruptions. The handover would include source code, configuration, database documentation, and operating instructions. Can you share the Seahawk unit’s PLC model and the communication protocols currently available for its sensor data?
$1,550 USD in 7 days
6.1
6.1

IF YOU ARE NOT HAPPY YOU DON'T PAY! The riskiest piece is the PLC link combined with patchy connectivity. If readings go straight to a remote server, any dropout leaves a gap in the job record, and acceptance criterion 1 fails. I'd sort that out first: a small edge box on the unit polls the PLC over Modbus TCP or OPC UA, timestamps each reading and writes it to a local PostgreSQL buffer. Data then syncs upstream whenever the link is back. On top of that I'd build a Node.js/TypeScript API with a React tablet dashboard that updates live over WebSockets. Stock deduction and reorder flags would run off the replacement records, and one-click Excel/PDF job reports would cover TotalEnergies' end-of-job documentation. Barcode scanning is easy to add as a later step. Rough timeline is 4-6 weeks, with scaling calibrated against your field gauges before the live test. Which PLC make and protocol does the Seahawk unit expose, and do you have its tag/register map? Send me a message and I'll explain exactly how I'd approach your project.
$1,500 USD in 5 days
5.5
5.5

Hi, We’ve built industrial data-logging systems that read PLC and sensor signals into dashboards with inventory tracking. For one oilfield services client, automated logs and parts counts replaced paper job records, cutting end-of-job reporting from days to hours. Architecture: An edge gateway reads OPC UA or Modbus from the unit’s PLC and stores readings locally (SQLite or Postgres) so intermittent connectivity never loses data. It syncs to a central PostgreSQL database, with a React tablet/web dashboard, Excel and PDF reports, and a barcode or RFID inventory module with reorder alerts. Proposal: $2,900, 7 weeks, with a field calibration test against your gauges before sign-off. Which PLC make and protocol does the Seahawk unit use? SolutionzHere
$2,900 USD in 35 days
5.5
5.5

Hi, -Ankit- here, from Bahrain. Building your real-time cement operations software with PLC comes down to one thing: numbers people trust and use to make decisions. I'm a senior software developer with 8+ years of experience working with PHP, Data Visualization, PostgreSQL and Node.js. For your real-time cement operations software, the real challenge is clean data and clear definitions. A common issue: building visuals before agreeing how each number is calculated, so reports disagree. My plan: first, agree each metric, its definition and its data source. Then, clean and model the data, and build the report pages in the BI tool. Finally, check totals against the source and set up scheduled refresh. For the stack, I'd suggest PLC and SQL Server. The timeline is in the bid details. I've done reporting work in Node.js. A few questions to better understand the scope: 1. Is any source a spreadsheet updated by hand? Manual sheets often break scheduled refreshes. 2. Start with one page that answers the top question? I'd recommend it, one trusted page comes first. 3. Who reads the dashboards, managers or analysts? The readers decide the level of detail. I can start right away. Happy to go over the details here in chat and suggest the best approach. Looking forward to hearing from you, -Ankit-
$1,500 USD in 13 days
5.3
5.3

A real-time cement operations system needs more than a dashboard—it needs reliable data integration, structured storage, and an interface that supports field decisions. My experience in web development, API development, software architecture, and engineering project coordination aligns well with connecting PLC/sensor signals to a practical operations platform. I can build around a robust backend using C#/.NET or PHP with SQL-compatible data storage, API services for hardware integration, and a responsive web or tablet dashboard for live volumes, rates, pressures, temperatures, cement usage, and replacement history. My data-visualization skills support clear operational views, while application and workflow experience fits consolidated Excel/PDF reporting, inventory deductions, reorder alerts, and barcode/RFID integration where supported. I also understand the importance of dependable operation in environments with intermittent connectivity, including secure raw-data storage and synchronization. My proposed delivery would be structured in phases: architecture and hardware integration, database and dashboard development, reporting/inventory features, then field validation against gauges and acceptance criteria. I would be glad to discuss the project and provide a practical implementation timeline for your next cementing campaign.
$1,500 USD in 7 days
5.5
5.5

Luanda, Angola
Payment method verified
Member since Oct 15, 2025
€750-1500 EUR
$30-250 USD
$30-250 USD
₹500000-1000000 INR
₹600-1500 INR
₹750-1250 INR / hour
₹12500-37500 INR
$250-750 USD
$250-750 AUD
₹150000-250000 INR
$30-250 CAD
$30-250 USD
$30-650 NZD
£250-750 GBP
$250-750 USD
$250-750 USD
$250-750 USD
$200-600 USD
$1500-3000 NZD
₹12500-37500 INR
₹75000-150000 INR
$10-30 USD
₹37500-75000 INR