
Lukket
Slået op
Betales ved levering
I’m turning a property in North Carolina into a commercial venue and the county has already given me a checklist of required drawings. I need those notes converted into a clean, professional set of permit-ready plans first, followed by a full construction set once the permit is in hand. The drawings must clearly show the stages and performance areas as well as all restrooms and supporting facilities. Accuracy is critical—everything has to align with the latest NC Building Code so the county can sign off without delays. I’ll forward the county documents, site measurements, photos, and any other background files the moment we start. Deliverables • Permit submission package: floor plan, elevations, sections, code analysis • Construction set: detailed layouts for stages/performance zones, restroom plumbing fixture counts, egress and accessibility paths, basic structural notes • Final files in PDF for printing and an editable CAD format A North Carolina architectural or engineering stamp isn’t mandatory, but if you can provide one please let me know. My target is to have the permit set ready within two weeks of kickoff, with quick turnaround on any county comments. Clear communication and timely revisions will keep us on schedule.
Projekt-ID: 40253869
1 forslag
Aktiv 13 dage siden
Lokation: Leland, United States
Fastsæt dit budget og din tidsramme
Bliv betalt for dit arbejde
Oprids dit forslag
Det er gratis at skrive sig op og byde på jobs
1 freelancere byder i gennemsnit $250 USD på dette job

⚡⚡⚡Licensed Professional Engineer⚡⚡⚡ Hi there, I understand you’re converting a North Carolina property into a commercial venue and need the county’s checklist translated into a clean, code-compliant permit set first, followed by a detailed construction package that clearly lays out stages, performance areas, restrooms, and all supporting facilities. Here is the main step for your project: * Review the county checklist, site measurements, and background files to develop a coordinated floor plan, elevations, sections, and code analysis aligned with the latest NC Building Code * Prepare a permit-ready package that clearly documents egress, accessibility, occupancy, and restroom fixture counts to streamline county approval * Develop a full construction set with detailed layouts, structural notes, and supporting documentation in both PDF and editable CAD format Please feel free to reach out so we can discuss the scope in more detail. Best Regards, Ray
$250 USD på 7 dage
1,4
1,4

Leland, United States
Betalingsmetode verificeret
Medlem siden jan. 17, 2026
$15-25 USD / time
$15-25 USD / time
$30-250 USD
$15-25 USD / time
₹12500-37500 INR
$200-500 USD
$30-250 USD
$250-750 USD
$10-30 USD
$30-250 USD
$2-8 USD / time
₹600-1500 INR
$5000-10000 USD
$250-750 AUD
$30-250 AUD
$30-250 USD
$30-250 USD
$108 USD
$250-750 USD
€8-30 EUR
$10-30 USD
$14-30 NZD
$30-250 CAD