Why People Can Always Tell When AI Wrote Your Text
Young adults are letting ChatGPT draft their texts and hard conversations. Here's why it's obvious and what actually works instead.
Required ment 1. Meter should display Voltage and current 2. In auto the pump should start whenever the power comes back 3. in manual unless he tact switch pressed should not start 4. another tact switch of switching offf the pump in between 5. high voltage , low voltage , over current , under current pump should stop 6. High current and low current over voltage under voltage all Therese paramaters should be settable
I am building a proof-of-concept rover whose only job is to prove that controlled, repeatable motion is possible inside transformer oil. To make that happen I need a complete blueprint package—detailed engineering drawings rather than a simple overview—showing exactly how to propel, steer, and recover a small test vehicle submerged in this highly viscous fluid. Rather than propellers, tracks, or wheels, I want the craft to move by exploiting buoyancy. Your design should use the density difference between the rover and the oil to generate thrust and directional control. This should not create any bubbling in oil while movements. Critical elements of the buoyancy control system that must appear clearly in the drawings • Adjustable weights • Air / water pumps Ev...
Assalam o alaikum, I am looking for Electrical & Electronics Engineers from PAKISTAN to be a part of my team and work on multiple tasks related to Circuit design, Embedded Systems, Control Systems, Power Systems etc. Applicants should have strong expertise in following softwares' Proteus Multisim TinkerCAD MATLAB/SIMULINK Applicants should have good expertise in writing short and long reports e.g. Final Year Project Reports. You should be well aware of Plagiarism Policies for writing technical documents.
I need expert assistance with wiring and ladder logic coding in EcoStruxure for my wind and solar hybrid project utilizing the following components: - Siemens S7-1200 PLC (CPU 1212C DC/DC/DC – 6ES7212-1AE40-0XB0 or equivalent) - 24 VDC DIN Rail Power Supply (2.5 A) - 20 W, 12 V Monocrystalline Solar Panel - 12 V, 30 W Permanent Magnet DC Wind Turbine Generator - 12 V, 12 Ah SLA/AGM Battery - 12 V, 10 A PWM Solar Charge Controller - Schottky Blocking Diodes (10 A, 45 V) - Inline Blade Fuses (15 A) - 24 VDC Relay Modules - 12 V, 10 W LED Load - 5.6 Ω, 50 W Dump Load Resistor - Voltage Divider Resistors for voltage sensing - DIN Rail Terminal Blocks and Accessories - DIN Rail, DC MCB (optional), and Emergency Stop Push Button - Required wiring, connectors, ferrules, cable glands,...
Young adults are letting ChatGPT draft their texts and hard conversations. Here's why it's obvious and what actually works instead.
OpenAI's model broke its own security test and attacked Hugging Face. Here's why AI still can't test AI safely.
Huge opportunity for ongoing work from a massive new Freelancer project