make a modern architectural design/plan for a 3 bedroom 2 story house with a pool sitting on a 300 square meter lot.

  • Status: Pending
  • Præmier: $200
  • Modtagne indlæg: 29

Konkurrence Instruktioner

Make a modern architectural design/plan and 3D rendering for a three bedroom two story house sitting on a 300 square meter lot.

"Lot layout and dimensions are attached"

The house must have the following:

- A lot of natural
- A swimming pool
- 3 bedroom
- 3 bathroom
- 1 office space
- A rooftop

Note: Keep in mind while designing this house that it will be in tropical areas temperatures are very hot. So try to imagine ways to keep air flow and coolness around the home.
Also I want to maximize the outdoor space.

Anbefalede færdigheder

Bedste indlæg fra denne konkurrence

Se flere indlæg

Offentlig Præciserings Opslagstavle

  • fahimeh22
    fahimeh22
    • 1 måned siden

    please check #69

    • 1 måned siden
  • santohusain49
    santohusain49
    • 1 måned siden

    Please check my entry #64 , contains floor plan and 3D rendering, Thank you

    • 1 måned siden
  • SsArchInt
    SsArchInt
    • 1 måned siden

    Please check #51, #61

    • 1 måned siden
  • roroARCHI
    roroARCHI
    • 1 måned siden

    Is the garage required? for how many cars
    The office can be on the 1st floor or must be on the ground floor?

    • 1 måned siden
  • Abujudy20085
    Abujudy20085
    • 2 måneder siden

    Failed to download and enter the charts because my account on freelancer is incomplete. I am very sorry. I have completed the identification information, and the freelancer website has sent a message that it will be reviewed within four days. I will send the charts after the site allows me to do so. Thank you, my dear brother

    • 2 måneder siden
    1. abniang4
      Konkurrenceafholder
      • 2 måneder siden

      Thank you Ali. No problem i will be waiting for your design

      • 2 måneder siden
    2. Abujudy20085
      Abujudy20085
      • 2 måneder siden

      Thank you

      • 2 måneder siden
  • Abujudy20085
    Abujudy20085
    • 2 måneder siden

    I present to you a house design that meets all the required requirements. The design was made on the land on which the design is required. The design is distinguished by the ground floor set back from the second floor to provide misleading and cool areas around the building in all directions. The building is ventilated from all sides. The swimming pool area was signed at the back of the building to provide privacy. The project is designed to suit the customs and traditions of the region, and the design is characterized by the presence of a double day at the entrance to the pool towards the north, which will help the movement of air to the second floor floor, and the design of green areas around the building at the entrances to the building and on the eastern, western and northern sides, hoping that it will be accepted.

    • 2 måneder siden
  • abniang4
    Konkurrenceafholder
    • 2 måneder siden

    I have uploaded another document that shows the lot positioning (lot 12) . I hope it helps

    • 2 måneder siden
    1. MFamilyGroup
      MFamilyGroup
      • 2 måneder siden

      thanks, but can you upload more clear pictures because your pictures still blurry.

      • 2 måneder siden
  • abniang4
    Konkurrenceafholder
    • 2 måneder siden

    I see some complaints about my account not being verified. Can someone please tell me what do i need to do to have it verified?

    I have numerous contests here and never had such complaints.

    • 2 måneder siden
    1. Rendesign
      Rendesign
      • 2 måneder siden

      i had contact with freelancer support and they told i wont be any trouble, all is fine at this moment.

      • 2 måneder siden
  • elliesuh90
    elliesuh90
    • 2 måneder siden

    Hello, are there setbacks for the lot ??

    • 2 måneder siden
    1. abniang4
      Konkurrenceafholder
      • 2 måneder siden

      no

      • 2 måneder siden
  • Rendesign
    Rendesign
    • 2 måneder siden

    Contest Holder, can you at least upload a goolge earth location to have an idea of the plot shape, in that way we can be a little more precise about our entries.
    Also, can you guarantee that you will hold the contest until the time you stablished is complete?

    The comunity will apreciate a response from you have a good day.

    • 2 måneder siden
    1. abniang4
      Konkurrenceafholder
      • 2 måneder siden

      I tried to replicate the lot shape using paint. I will try to upload a google map location by tomorrow.
      also yes i can guarantee that the contest will run for the time established.

      • 2 måneder siden
  • aja55d5a832846d2
    aja55d5a832846d2
    • 2 måneder siden

    #increaseprize

    • 2 måneder siden
  • tatysmithv
    tatysmithv
    • 2 måneder siden

    #increaseprize #increaseprize #increaseprize

    • 2 måneder siden
  • bebo1979tayson
    bebo1979tayson
    • 2 måneder siden

    Dear Contest Holder please note that all deliverables will be in different dimension for all entries while you didn't give us at least diagonal measurement and angels. all drawings will not be correct and not matching the site condition during execution stage.

    • 2 måneder siden
  • izadea
    izadea
    • 2 måneder siden

    #increaseprize

    • 2 måneder siden
  • badriahsara
    badriahsara
    • 2 måneder siden

    #increaseprize #increaseprize

    • 2 måneder siden
  • ImtRanchi
    ImtRanchi
    • 2 måneder siden

    #sealed #increaseprize

    • 2 måneder siden
  • SsArchInt
    SsArchInt
    • 2 måneder siden

    #increaseprize

    • 2 måneder siden
  • engrmoynul23
    engrmoynul23
    • 2 måneder siden

    Dear Sir, Proper survey report of the project must be required while starting the work of your project. Since the measurements of the four sides of your project area are not regular.

    • 2 måneder siden
  • agungwm2313
    agungwm2313
    • 2 måneder siden

    #increaseprize #increaseprize

    • 2 måneder siden
  • abdolshahisaba
    abdolshahisaba
    • 2 måneder siden

    I guess its a new policy .. I run for my prize money and beg clients to verify and they don't because it need their information. If you dont want to verify its just wasting time for designers.

    • 2 måneder siden
  • abdolshahisaba
    abdolshahisaba
    • 2 måneder siden

    Dear client
    Please verify your account at first. I won 2 competition and the sit has blocked my prize because my clients have not verified their accounts. If you are not going to verify your account your money is not going to reach the winner. Its just freezing in account.

    • 2 måneder siden
  • corvicenti
    corvicenti
    • 2 måneder siden

    Dear contest holder, do you want the house with 1 storey or 2 storeys?

    • 2 måneder siden
  • yousefhekal26
    yousefhekal26
    • 2 måneder siden

    What are the construction materials used in building.

    • 2 måneder siden
  • Draftman07
    Draftman07
    • 2 måneder siden

    #increaseprize

    • 2 måneder siden

Vis flere kommentarer

Sådan kommer du i gang med konkurrencer

  • Opret din konkurrence

    Opret din konkurrence Hurtigt og nemt

  • Få tonsvis af indlæg

    Få tonsvis af indlæg Fra hele verden

  • Tildel det bedste indlæg

    Tildel det bedste indlæg Download filerne - Nemt!

Opret en Konkurrence Nu eller slut dig til os i dag!