4 case studies from impacted construction companies (Construction Projects) by COVID-19 with different construction contracts ( AIA, NEC, PWC, FIDIC)
- Status: Closed
- Præmier: $75
- Modtagne indlæg: 3
- Vinder: priyajen
Konkurrence Instruktioner
4 case studies from impacted construction companies (Construction Projects) as following :
1 case studies : the contract between contractor and owner is AIA contract.
1 case studies : the contract between contractor and owner is KSA PWC contract.
1 case studies : the contract between contractor and owner is NEC contract.
1 case studies : the contract between contractor and owner is FIDIC contract.
the needed information as bellow :
- brief about the company and the project and its location :
1- How COVID-19 effected projects ?
2- What are the implications of COVID-19 on a project?
3- How project managers acted in response to COVID-19?
4- Did the company check the contracts to know their rights in such a situation?
5- Did the company ask for time extension from the owner ? and what was the owner's response?
6- Did the company ask for additional compensation from the owner ? and what was the owner's response?
7- Did the owner delay the payments because of COVID-19 Impact ?
8- Was the project suspended or terminated? by who? and why?
9- What is the lessons learned from such a situation?
10- What are the recommendations for improving future construction contracts to deal with such a situation?
Anbefalede færdigheder
Arbejdsgiverfeedback
“Great work exceptional in the quality, quick and informative communication and expertise on the project. Highly recommend ”
Az123600, Saudi Arabia.
Bedste indlæg fra denne konkurrence
-
priyajen India
-
AshiqEnterprise Bangladesh
Offentlig Præciserings Opslagstavle
Sådan kommer du i gang med konkurrencer
-
Opret din konkurrence Hurtigt og nemt
-
Få tonsvis af indlæg Fra hele verden
-
Tildel det bedste indlæg Download filerne - Nemt!